Laserfiche WebLink
Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services <br />for City of Santa Ana, RFP No. 20-111 <br />APPENDIX A <br />County of Los Angeles Department of Public Works, Rancho Los Amigos Rehabilitation <br />Hospital, Site 1 Demolition and Make -Ready Project, Downey, CA. H&S Officer. Kleinfelder is <br />providing building inspections, materials testing, geotechnical engineering, IOR, and hazardous <br />materials abatement monitoring. Mr. Reese managed the abatement oversight of hazardous <br />building materials, including asbestos -containing materials (ACM) and lead -based <br />paints/materials for various facility buildings at the Rancho Los Amigos facility prior to demolition <br />for the Site 1 Make -Ready Project. Also was responsible for coordinating internal and <br />subcontracted resources, review of analytical and H&S containment data, preparation of post - <br />abatement close-out reports, and coordination with client and project stakeholders. <br />LA County METRO, Site -Specific H&S Plan for Division 20 Portal Widening, Los Angeles <br />County, CA. H&S Officer. The project included the oversight of the demolition of existing <br />buildings, including the evaluation and removal of hazardous building materials, and excavation of <br />environmentally impacted soil resulting from industrial activities performed by prior property <br />owners. Mr. Reese participated in the preparation of the Site -Specific H&S Plan, provided consult <br />for managing safety -related change in condition and performed periodic audits of Kleinfelder safe <br />work behavior to verify compliance with applicable occupational safety and health regulations and <br />Kleinfelder's Injury and Illness Prevention Plan. <br />Riverside County Transportation Commission, Irvine Corona Expressway, Orange and <br />Riverside County, CA. H&S Officer. Mr. Reese provided periodic support as a field scientist for <br />feasibility -level geotechnical investigation for 10-mile long transportation corridor for twin 50 ft. <br />diameter tunnels through the Santa Ana Mountains. The investigation included five (5) deep rock <br />core borings up to 1,500 feet deep to evaluate rock mass characteristics, groundwater conditions <br />and hydraulic conductivity, and preparation of geotechnical data and assessment reports. Specific <br />project duties included: H&S monitoring and oversight, assistance with core sample preparation, <br />and monitoring for compliance with US Forest Service and other applicable project permits. <br />City of Los Angeles, Department of Water and Power, Streetlight, Los Angeles, CA. H&S <br />Officer. Mr. Reese managed a human health risk assessment project which evaluated the <br />potential intrusion of PCE vapors into indoor air within office buildings. Responsibilities included <br />development of experimental design, establishing laboratory reporting limits, oversight of <br />subcontractor installation of sub -slab soil vapor probes, collection of sub -slab soil vapor and air <br />samples, and preparation of assessment report and Tier 1 HHSE. <br />City of Los Angeles, Department of Water and Power, Former DKR Lease Site, Los Angeles, <br />CA. H&S Officer. Mr. Reese was responsible for implementing a shallow soil, soil vapor, sub -slab <br />soil vapor, and indoor/outdoor air sampling program associated with a release from a gasoline <br />UST. Responsibilities included scoping field sampling approach, establishing laboratory reporting <br />limits, oversight of subcontractor installation of soil gas and sub -slab soil vapor probes, collection <br />of soil, soil vapor, and air samples, and preparation of assessment report and Tier 1 HHSE. <br />City of Long Beach, Long Beach Airport Cover Street Stockpile Sampling, CA. H&S Officer. <br />Managed the assessment and environmental testing of a 66,000 cubic yard stockpile of soil and <br />construction debris accumulated from multiple construction projects at the airport. The stockpile <br />constructed of discontinuous strata of soil, concrete, and asphalt was not structurally sound and <br />Mr. Reese created an assessment plan consisting of a combination of excavation and limited <br />access hollow -stem auger drilling to fully assess the stockpile. Responsible for creating an <br />experimental design and analytical testing regiment, H&S plan, submitting a FAA 7460 <br />notification, subcontractor management, and preparing an environmental assessment report used <br />by the City to prepare bid documents for disposal of the stockpile. <br />�Hssnvr-�cos+a <br />Bryan Reese 2 <br />nnwzmszaomry� P I <br />