Kleinfelder Statement of Qualifications for On -Call Material Testing and Special Inspection Services
<br />for City of Santa Ana, RFP No. 20-111
<br />APPENDIX A
<br />County of Los Angeles Department of Public Works, Rancho Los Amigos Rehabilitation
<br />Hospital, Site 1 Demolition and Make -Ready Project, Downey, CA. H&S Officer. Kleinfelder is
<br />providing building inspections, materials testing, geotechnical engineering, IOR, and hazardous
<br />materials abatement monitoring. Mr. Reese managed the abatement oversight of hazardous
<br />building materials, including asbestos -containing materials (ACM) and lead -based
<br />paints/materials for various facility buildings at the Rancho Los Amigos facility prior to demolition
<br />for the Site 1 Make -Ready Project. Also was responsible for coordinating internal and
<br />subcontracted resources, review of analytical and H&S containment data, preparation of post -
<br />abatement close-out reports, and coordination with client and project stakeholders.
<br />LA County METRO, Site -Specific H&S Plan for Division 20 Portal Widening, Los Angeles
<br />County, CA. H&S Officer. The project included the oversight of the demolition of existing
<br />buildings, including the evaluation and removal of hazardous building materials, and excavation of
<br />environmentally impacted soil resulting from industrial activities performed by prior property
<br />owners. Mr. Reese participated in the preparation of the Site -Specific H&S Plan, provided consult
<br />for managing safety -related change in condition and performed periodic audits of Kleinfelder safe
<br />work behavior to verify compliance with applicable occupational safety and health regulations and
<br />Kleinfelder's Injury and Illness Prevention Plan.
<br />Riverside County Transportation Commission, Irvine Corona Expressway, Orange and
<br />Riverside County, CA. H&S Officer. Mr. Reese provided periodic support as a field scientist for
<br />feasibility -level geotechnical investigation for 10-mile long transportation corridor for twin 50 ft.
<br />diameter tunnels through the Santa Ana Mountains. The investigation included five (5) deep rock
<br />core borings up to 1,500 feet deep to evaluate rock mass characteristics, groundwater conditions
<br />and hydraulic conductivity, and preparation of geotechnical data and assessment reports. Specific
<br />project duties included: H&S monitoring and oversight, assistance with core sample preparation,
<br />and monitoring for compliance with US Forest Service and other applicable project permits.
<br />City of Los Angeles, Department of Water and Power, Streetlight, Los Angeles, CA. H&S
<br />Officer. Mr. Reese managed a human health risk assessment project which evaluated the
<br />potential intrusion of PCE vapors into indoor air within office buildings. Responsibilities included
<br />development of experimental design, establishing laboratory reporting limits, oversight of
<br />subcontractor installation of sub -slab soil vapor probes, collection of sub -slab soil vapor and air
<br />samples, and preparation of assessment report and Tier 1 HHSE.
<br />City of Los Angeles, Department of Water and Power, Former DKR Lease Site, Los Angeles,
<br />CA. H&S Officer. Mr. Reese was responsible for implementing a shallow soil, soil vapor, sub -slab
<br />soil vapor, and indoor/outdoor air sampling program associated with a release from a gasoline
<br />UST. Responsibilities included scoping field sampling approach, establishing laboratory reporting
<br />limits, oversight of subcontractor installation of soil gas and sub -slab soil vapor probes, collection
<br />of soil, soil vapor, and air samples, and preparation of assessment report and Tier 1 HHSE.
<br />City of Long Beach, Long Beach Airport Cover Street Stockpile Sampling, CA. H&S Officer.
<br />Managed the assessment and environmental testing of a 66,000 cubic yard stockpile of soil and
<br />construction debris accumulated from multiple construction projects at the airport. The stockpile
<br />constructed of discontinuous strata of soil, concrete, and asphalt was not structurally sound and
<br />Mr. Reese created an assessment plan consisting of a combination of excavation and limited
<br />access hollow -stem auger drilling to fully assess the stockpile. Responsible for creating an
<br />experimental design and analytical testing regiment, H&S plan, submitting a FAA 7460
<br />notification, subcontractor management, and preparing an environmental assessment report used
<br />by the City to prepare bid documents for disposal of the stockpile.
<br />�Hssnvr-�cos+a
<br />Bryan Reese 2
<br />nnwzmszaomry� P I
<br />
|