My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CHAMBERS GROUP, INC. (4)
Clerk
>
Contracts / Agreements
>
C
>
CHAMBERS GROUP, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2021 4:16:52 PM
Creation date
7/19/2021 3:58:14 PM
Metadata
Fields
Template:
Contracts
Company Name
CHAMBERS GROUP, INC.
Contract #
A-2021-110-02
Agency
Community Development
Council Approval Date
7/6/2021
Expiration Date
7/31/2022
Insurance Exp Date
5/12/2022
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP #21-017: On -Call Environmental Review Services for the CHAMBERS <br />Housing Division GROUP <br />City of Santa Ana Community Development Agency <br />Expertise Cont d II Environmental Sites Assessments, Vapor Encroachment, Building Energy Efficiency <br />Preliminary Endangerment <br />and Fungal (2008 to 2016). <br />Assessments <br />Phase I Environmental Site Assessments (Phase I ESA) - Completed and managed Phase <br />Property Condition & PMLA <br />I ESAs for EPA Brownfield Grantees, banks, cities, developers and school districts. Sites <br />assessed have included heavy industrial, light industrial, landfills, shopping malls, <br />Regulatory Agency Liaison <br />schools/universities, hospitals, office buildings, parks, agricultural operations, <br />Risk Assessments <br />residential, and undeveloped land, including related Initial Site assessments (ISAs) for <br />Caltrans projects. Norman is actively involved with the ASTM E50.02 Task Group for the <br />Removal Actions &Work <br />ASTM1527 Standard for Phase I ESAs and co-authored an ASTM Published Technical <br />Plans <br />Manual on this Standard. <br />Remediation <br />Phase II Environmental Site Assessments (Phase 11 ESAs) - In conjunction with <br />Stormwater Pollution <br />Professional Geologists and Engineers, Norman has completed Phase II ESA scope of <br />Prevention Plans <br />services throughout California, Nevada, Arizona, Washington, and Oregon. He was <br />Affiliations <br />active in the revising of the ASTM Standard for Phase II ESAs and co-authored an ASTM <br />Published Technical Manual on this Standard. <br />Member ASTM E.50 <br />Preliminary Endangerment Assessments and Removal Actions - Norman was Principal <br />Committee on <br />Environmental Assessment, <br />in Charge for Preliminary Endangerment Assessments (PEA), Supplemental Site <br />Risk Management and <br />Investigations (SSIs) and Removal Actions. Work has also included the generation of PEA <br />Corrective Action (Former <br />Workplans, Conceptual Site Models, Human Health Risk Assessments (HHRA) and final <br />Subcommittee <br />Subcommittee Chairman <br />PEA reports. Work has been <br />P approved by the EPA Brownfields Unit, Department of <br />2008-2016) <br />Toxic Substances Control, Regional Water Quality Control Board and various Certified <br />Unified Program Agencies. <br />Asbestos, Lead -Based Paint (LBP) and Fungal Surveys/Abatement <br />Monitoring/Clearance Sampling - Completed and managed asbestos, LBP and fungal <br />projects in conjunction with Certified Site Surveillance Technicians and CDPH Certified <br />Lead Professionals to complete surveys, abatement specifications and abatement <br />monitoring projects on public works projects, hospitals, hotels, schools/universities, <br />retail shopping malls and commercial offices. Current with pending South Coast Air <br />Quality Management District changes to Rule 1403. <br />Methane Assessment, Monitoring and Remedial Design - Provided methane <br />assessmentto developers in accordance with Cityof Los Angeles City Building and Safety <br />Department. Monitoring Services have been completed for the Los Angeles Unified <br />School District at RFK High School and Roybal Learning Center, Landfill Gas Monitoring <br />for the Los Angeles County CEOs Office design and installation of methane mitigation <br />systems on low-rise residential buildings in Downtown Los Angeles, clean closure of <br />Canyon Park Hog Ranch. <br />Remediation - Completed and managed dig and haul, soil vapor extraction, air sparge, <br />pump and treat remediation projects. <br />Storm Water Pollution Prevention Plans (SWPPPs) and Monitoring - Assisted and was <br />the Principal -in -Charge for the preparation of SWPPPs for military, educational, <br />commercial, transportation and residential construction sites in conjunction with <br />Qualified Stormwater Developers and Practitioners. <br />Publications <br />ASTM International Manual, Technical Aspects of Phase 1/II Environmental Site <br />Assessments 3rd Edition, 2015. <br />3�lmk t A-36 <br />�Ai'c 1979 www chambersgroupinc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.