Laserfiche WebLink
9. CNG COMPRRESOR COMPOUND AREA <br />Each compressor and related controls, hardware, and associated CNG system equipment shall be free <br />from defects or wear, in good working order and free of detectable leaks. Waste oil and other <br />disposable liquids shall be stored in the proper containers and removed and emptied once per month <br />in a safe and legal manner per the Federal, State or Local requirements. <br />10, RECORD KEEPING AND SYSTEM MONITORING <br />Contractor shall provide copy of the company's service report with all pertinent information regarding <br />the service(s) to include the status of all the CNG station components. A copy of the company's service <br />report with all pertinent information regarding the service(s) are to be signed with a copy left at the Fleet <br />Services office; and a copy is to be emailed to ESosaC@santa-ana.orci with the invoice. <br />---End of SCOPE OF WORK FOR OPERATE AND MAINTENANCE Section. --- <br />City of Santa Ana — RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />33 <br />