Laserfiche WebLink
C - FIRM & TEAM EXPERIENCE <br /> Village of Oak Park Portfolio, Oak Park, IL <br /> Client: Village of Oak Park, Illinois <br /> Contact: Lisa Shelley - Village Manager — (708) 383-6400 — villagemanager@oak- <br /> ark.us <br /> Project Discussion: AEI is preparing FCAs in accordance with ASTM E2018-15 on a <br /> portfolio of 2 fire stations and 3 water pumping station buildings <br /> comprising an area of 32,600 SF. AEI is capturing data in tablets and <br /> utilizing KyKloud software in the preparation of the FCA reports and <br /> global FCA database. Michael Novick, RA is performing field <br /> inspections and preparing the FCA analysis and project management <br /> and senior level technical review is being performed Matt Wasson. <br /> Presentation: AEI's project deliverables include narrative FCA reports, geo-coded <br /> photos, equipment & condition inventories, ADA accessibility data and <br /> cost estimates for future maintenance and replacements. Key <br /> information to be included in the reports is each building's Facility <br /> Condition Index (FCI), Expected and Remaining Useful Lives (EULs & <br /> RULs) of equipment and building systems, and a 10-year capital <br /> expenditure budget. <br /> Date: January 2020 <br /> �. <br /> sw �Iro <br /> Oak Park <br /> a _ <br /> City Council 21 — 2EJ 5/3/2022 <br /> AEI Consultants <br />