My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C — FIRM & TEAM EXPERIENCE <br /> Evergreen School District, San Jose, CA <br /> Client: Aedis Architects & Evergreen School District <br /> John Diffenderfer— President— (408) 221-9011 — <br /> jdiffenderfer aedisarchitects.com <br /> Project AEI completed Facility Condition Assessments on a portfolio of 18 <br /> Discussion: elementary and middle school campuses of the Evergreen School District as <br /> well as the district's main administrative offices. The portfolio comprises a <br /> total building area of over 1.2MM SF. As part of this assessment, AEI is <br /> completing an asset inventory and facility assessment in advance of <br /> proposed renovations. AEI is working closely with the design architect and <br /> school district to determine what systems and equipment can be salvaged <br /> prior to the design stage of rehabilitation. Preparation of a complete <br /> database of various building systems and equipment is also included in the <br /> scope of work. <br /> Presentation: AEI utilized an FCA software application with similar capabilities to Kykloud <br /> as well as tablet data collection devices in developing FCA reports. AEI's <br /> project deliverables include narrative FCA reports, geo-coded photos, <br /> equipment &condition inventories, ADA accessibility data and cost estimates <br /> for future maintenance and replacements. Key information included in the <br /> reports is each building's Facility Condition Index (FCI), Expected and <br /> Remaining Useful Lives (EULs & RULs) of equipment and building systems, <br /> and a 10 years capital expenditure budget. All that data is integrating <br /> seamlessly with the client's maintenance management software platform. <br /> Date: Completed December 2018 <br /> GNA61iYA MIP11�4 gg196 <br /> Evergreen <br /> School District <br /> ti <br /> City Council h AEI Consultants 5/3/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.