My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Agenda Packet_2022-05-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 3:10:44 PM
Creation date
5/16/2022 2:16:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/17/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1584
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALAMEDA CORRIDOR EAST CONSTRUCTION AUTHORITY (ACE) <br />SAN GABRIEL TRENCH PROJECT <br />At 2.2 miles long, 65 feet wide, and 30 feet deep, the San Gabriel Trench Project is ACE's largest project <br />endeavor. It involved separating the Union Pacific Rail Road (UPRR) track from at -grade vehicular traffic by <br />lowering the existing track and constructing bridges to allow vehicles and pedestrians to pass safely overhead. <br />As the right of way program manager, Paragon also provided property management services during and post <br />acquisition phases. Approximately 22 homes and 26 businesses in the neighborhood were impacted. <br />Of notable significance was a full fee acquisition of a 86,263 s.f. property, the location of a 379-unit public <br />storage facility. The project required the relocation of all personal property stored in approximately 235 rental <br />units, as well as the on -site property manager and his family. Paragon directed and managed the 18-month <br />property management and relocation efforts including rent collections, vacancy inspections, and on -site <br />security for the property. Once the storage units were vacated, Paragon was faced with security issues, <br />vandalism, illegal activity and the threat of occupancy by vagrants. We creatively resolved these issues by <br />offering local businesses the use of the remaining units to store business related equipment, utilizing the <br />remaining buildings as a construction field office, and equipment and storage yard. This also yielded a "Win - <br />Win" situation: ACE and the City of San Gabriel maintained the safety of the neighborhood by circumventing <br />potentially unsafe and illegal activity of others by maintaining a strong physical on -site presence. <br />SERVICES PROVIDED <br />• Property management during and post - <br />acquisition <br />• Prepare and facilitate short and long term <br />rental agreements <br />• Rent collections <br />• Eviction services <br />• Property maintenance <br />• Coordinate utility connections and <br />disconnections <br />• Coordinate security, maintenance, <br />environmental and demolition services <br />• Acquisition of right of way and property <br />• Relocation assistance and status reports <br />• Document and project control <br />• Scheduling, cost tracking and reporting <br />CONTACT <br />Mark Christoffels <br />HDR/WKE - Principal Engineer <br />(714) 460-2434 <br />mchristoffels@wke-inc.com <br />DURATION <br />2018 <br />11 QRQQ Council CITY OF SANTAANA I I PdR3rh' MANAGEMENT SPECUL1XURCES 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.