My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GROUP 4 ARCHITECTURE, RESEARCH+PLANNING, INC
Clerk
>
Contracts / Agreements
>
G
>
GROUP 4 ARCHITECTURE, RESEARCH+PLANNING, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 4:46:02 PM
Creation date
5/26/2022 12:33:28 PM
Metadata
Fields
Template:
Contracts
Company Name
GROUP 4 ARCHITECTURE, RESEARCH+PLANNING, INC
Contract #
A-2022-060
Agency
Public Works
Council Approval Date
4/19/2022
Expiration Date
4/18/2025
Insurance Exp Date
7/18/2022
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A SCOPE OF WORK <br />• Title Sheet <br />• Civil Engineering <br />o Site Erosion Plan <br />o Parking lot along Ross Street with Access Control (parking meters, gate, bollards, etc.) <br />o Horizontal and Vertical Control Plan <br />o Grading And On -Site Drainage Plan <br />o Site Utility Plan <br />• Landscape Architectural <br />o Site Layout/Construction Plans And Details (including plumbing) <br />o Site Sections, as applicable <br />o Planting Plans/Details/Notes <br />o Irrigation Plans/Details/Calculations/Notes <br />• Architectural <br />o Demolition Plans (Basement, I", & 2°dFloors) <br />o Construction Plans (Basement, ln, & 2"dFloors) <br />o Reflected Ceiling Plans (Basement, I ", & 2' Floors) <br />o Furniture Plans (Basement, 1', & 2"dFloors) and Furniture schedule and budget <br />o Shelving Plans, and Schedules <br />o Exterior Elevations <br />o Interior Elevations <br />o Mechanical and Plumbing Plans/T-24 <br />o Electrical Plans, as applicable <br />o Architectural Details <br />o Structural Calculations <br />o Door/Window/Finish Schedules, as applicable <br />o ADA Path of Travel design and/or <br />o Code Rquired signagePlan <br />Structural Engineering <br />o Structural Design and Detailing <br />Mechanical Engineering & Plumbing <br />Electrical Engineering <br />o Electrical Site Plan to include walkway/parking lot lighting, irrigation. <br />o Photometrics. <br />o Location of panels, switchgear, meters <br />o Schedules <br />o Details <br />o Notes, specifications <br />Plan Check & Permits: <br />Construction drawings shall be in accordance with the 2019 California Building Code and will require <br />review/approval by the City Planning and Building Agency. Additionally, this would be subject to review by <br />the Historic Resources Commission. <br />EXHIBITA Page At-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.