Laserfiche WebLink
requirements. We are able to conduct VMT analyses as required by Section 15064.3 of the Public Resources <br />Code. <br />Air Quality and Greenhouse Gas Impact Analysis, Energy Use Calculations, Health Risk Assessments (HRA), and <br />Noise/Vibration Impact Analysis <br />Urban Crossroads, Inc. has extensive experience in SCAQMD's requirements for preparation of CEQA Air <br />Quality and Greenhouse Gas Analysis, including screening -level Carbon Monoxide (CO) Hot Spot analysis <br />of future conditions, Construction and Operational Localized Significance Threshold (LST) analysis as <br />recommended by the South Coast Air Quality Management District (SCAQMD), and evaluation of applicable <br />federal and state regulatory requirements using various methodologies (i.e., AB32, SCAQMD, CAPCOA <br />thresholds). Urban Crossroads, Inc. staff also have extensive experience and a strong technical background <br />in the analysis and mitigation of air toxic and criteria pollutants for Health Risk Assessments (HRA). Industry - <br />standard modeling methodology is used in order to accurately determine if potential health impacts may <br />occur. For Noise Assessments, Urban Crossroads, Inc. staff are experienced with collecting noise level <br />measurements for a variety of projects from residential homes to commercial and warehouse developments <br />and use equipment which meets the latest American National Standards Institute (ANSI) standard <br />specifications for sound level meters. <br />Biological Resources and Jurisdictional Permitting <br />Blackhawk Environmental, Inc.'s biologists work across Southern California providing environmental consulting <br />services including biological resources surveys, construction monitoring, mitigation management, monitoring <br />and compliance, regulatory agency consulting, agency negotiations and permitting, restoration, <br />environmental document preparation, and water resources assessments, analyses, and delineations. Their <br />services in support of IEUA projects would include habitat assessments; protocol threatened, endangered, <br />and sensitive plant and wildlife species surveys; jurisdictional delineations; and development of mitigation <br />measures. <br />Cultural Resources (Archaeological, Historic, and Paleontological Resources Assessments) <br />Material Culture Consulting consists of cultural resource professionals with expertise in archaeology, <br />ethnography, history, tribal cultural resource consultation, traditional land use studies, AB 52/SB18 <br />consultation, and agency consultation to accomplish regulatory compliance under CEQA, NEPA, and other <br />historic preservation statutes and implementing regulations. With the main office location in Pomona, Material <br />Culture Consulting staff are familiar with, and have performed analysis for many projects in Southern <br />California. - <br />Environmental Site Assessments <br />Hillmann Consulting, LLC specializes in the assessment and remedicition of hazardous materials. With a <br />thorough knowledge of ASTM standards for Environmental Site Assessments, including Phase I, Phase II, and <br />Phase III reporting, they have performed environmental site assessments for thousands of sites in Southern <br />California. <br />We also have close working relationships and preferential pricing with multiple other technical specialists in <br />a wide variety of expertise, including engineering, water quality and hydrology, water supply assessments, <br />geotechnical, Phase I and hazardous materials, architecture and landscape architecture, to made a few. <br />Task 2. Draft Initial Study <br />Once the project strategy has been developed and considered by the city, EPD will prepare or review the <br />Initial Study checklist to determine the appropriate CEQA documentation for the project. EPD will identify <br />technical experts responsible for preparation of necessary environmental surveys and studies (e.g., <br />biological, noise, archaeological, historical, etc.) and will assign staff responsible for completing all tasks. <br />Our approach to all projects focuses on collaboration. Our research conducted as part of this task, in close <br />Environmental and Planning Services RFQ #20-100 <br />EPD Solutions, Inc. <br />