Laserfiche WebLink
SCOPE OF WORK <br />TASK 1. CONSULTATION CONCERNING RECIRCULATED DRAFT PEIR <br />In accordance with the CEQA Guidelines, a Recirculated Draft EIR is subject to the consultation requirements of <br />Section 15086. PlaceWorks will coordinate with City staff to determine the consultation procedure preferred. This <br />task assumes that PlaceWorks will draft correspondence to notify responsible agencies that the City is preparing a <br />Recirculated Draft PEIR that includes information on the contents proposed (list of chapters). Per Section 15086, the <br />lead agency may also consult with any member of the public that has filed a request for notice and any person that <br />may be concerned with the environmental effects of the project. At this time, It is anticipated that the expanded <br />community outreach process will achieve this objective. <br />TASK 2. PREPARE SCREENCHECK DRAFT RECIRCULATED PEIR <br />As described under recommended approach, the Recirculated PEIR will consist only of those chapters that need to be <br />updated and recirculated. Following is a brief description of the content anticipated for the chapters that will be <br />recirculated; <br />Executive Summary. this section will be updated to reflect the changes in the other recirculated chapters as well as <br />the revisions to the Draft PEIR (mostly updated policies and Implementation actions) that are included in the Final EIR <br />already prepared. The. Executive Summary table will reflect updates to Impacts, mitigation measures and significance <br />concluslons. <br />Project Description, this section will be updated to integrate the changes and refinements to the GPU slnce the original <br />project description. Land use changes are not anticipated at this time. Changes will Includes updates policies and <br />implementation actions, as well as corrections to existing and proposed land use statistics as Included In the Final EIR. <br />This section will also Include the Mobility Element changes as Included in the Final EIR. <br />Air Quality. this section will be supplemented to provide Information on environmental justice and health risk. It will <br />also include updated policies and Implementation actions. It will not include an update to the technical study or <br />modeling for the proposed GPU. <br />Hazards and Hazardous Materials, slm ilar to the air q ua Ilty section, the updated hazards section will provide additional <br />context for environmental justice -related Issues, and information regarding potential lead hazards as identified In <br />comments received on the Draft PEIR. It will also provided updated GPU policies and implementation actions. <br />Recreation. the updated Recreation section will provide a more detailed geographic description of open <br />space/recreation facilities for both existing and proposed conditions under Implementation of the GPU and <br />comparison of these conditions with applicable standards (e.g. park space acres/capita). It will include GPU policies <br />and Implementation actions added subsequent to the Draft PEIR and Included in the Final EIR as well as any <br />refinements that may evolve as part of extended community outreach and participation. It is anticipated that <br />-_-- - — — — - Recreation will be determined to be a significant impact. <br />Alternatives. this section will be supplemented to include at 1-2 additional project alternatives. It is expected that one <br />alternative will be defined in consultation with the City to address the significant recreation impact. A lower density <br />alternative may also be considered If desired by the City. <br />January 28, 20211 Page 4 <br />