Laserfiche WebLink
Other Draft PEIR Chapters. It Is assumed that the City will want a complete, updated copy of the Draft PEIR. Remaining <br />chapters (those not detailed above for recirculation) will be updated to reflect the changes documented In Chapter <br />3, Revisions to the PraftEIR of the Final PEIR. <br />The Screencheck Draft Recirculated PEIR will be submitted to the City for review. It is anticipated that only electronic <br />copies will be required. <br />TASK 3. PREPARE DRAFT RECIRCULATED PEIR <br />PlaceWorks will review the Recirculated PER upon receipt of City review comments. Ourscope of work assumes that <br />only one Iteration of revlew/revislons will be required. Upon approval PlaceWorks will prepare the public draft for <br />distribution and for posting on the City's website <br />TASK 4. NOTICE OF AVAILABILITY/PUBLIC REVIEW <br />The Recirculated Draft PEIR Is subject to the same noticing and public review requirements as the original Draft PEIR. <br />PlaceWorks will prepare the Notice of Availability and Notice of Completion and distribute the Recirculated PEIR to <br />the same mailing list (as supplemented by commenters on the Draft PEIR) as the original EIR. The Draft Recirculated <br />PEIR will be circulated for 45-days. We will coordinate with the City to electronically file the EIR with OFF. <br />TASK S. FINAL EIR— RESPONSE TO COMMENTS <br />The Final EIR will consist of the updated Draft PEIR (combined original Draft EIR and Draft Recirculated PEIR), the <br />Response to Comments (updated as needed) from the original Draft PEIR, the Response to Comments to new <br />comments received on recirculated chapters, and any revisions to the Draft Recirculated PEIR required to respond to <br />the new set of comments. our cost estimate Is based on a moderate level of comment. If a greater level of comment <br />than anticipated is received, a budget augment may be required. <br />TASK 6 MMRP, FACTS AND FINDINGS & STATEMENT OF OVERRIDING CONSIDERATIONS <br />PlaceWorks will update the MMRP, Facts and Findings and Statement of Overriding Considerations to reflect the Final <br />El R. <br />TASK 7. PUBLIC HEARINGS <br />Our scope of work assumes our attendance at up to three public hearings, At this time, it is assumed these meetings <br />will be held virtually. <br />TASK 8. PROJECT MANAGEMENT & COORDINATION <br />This task includes ongoing project managements and coordination with the City. For cost estimating purposes we <br />have assumed the schedule as summarized In the next section, and participation in up to 12 conference call/Zoom <br />-- -- --- meetings (8 conference calls were assumed in our previous submittal). Our cost estimate, as in the previous <br />submittal, is based on an estimated 2 hours/week of our Project Manager's time for project <br />management/coordination, <br />January 28, 20211 page 5 <br />