My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_8-22-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
8-22-22
>
Packet_8-22-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 2:43:39 PM
Creation date
8/23/2022 2:40:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUP No. 2022-13 - Compass Bible Church <br />August 22, 2022 <br />Page 2 <br />2 <br />8 <br />9 <br />3 <br />not include a request for a school or day care facility. Furthermore, the building consists <br />of 20,235 square feet on the first floor and 3,609 square feet on the second floor, for a <br />total of 23,844 square feet. The first floor will include the lobby, main auditorium, youth <br />rooms, nursery rooms to be used during services and classes, meeting rooms, bookstore, <br />kitchen, restrooms, and storage rooms. The second floor will be dedicated to <br />administrative offices. The church will operate seven days a week; however, the worship <br />services and religious education uses will take place on weekends and during evenings. <br />Interior tenant improvements include demolition of nonbearing walls and construction of <br />new interior partitions, upgrades to the electrical wiring, new plumbing fixtures, new <br />mechanical equipment, and fire sprinklers. Exterior improvements include removing roll <br />up doors and replacing them with new storefront windows and doors, restriping the <br />parking lot to provide an entrance plaza/exit discharge delineated by truncated domes as <br />required by the California Building Code, bicycle racks, and accessible parking and <br />walkways. <br />Table 1: Project Location and Information <br />Item Information <br />Project Address & Council Ward 2909 South Daimler Street (Ward 6) <br />Nearest Intersection Daimler Street & Deere Avenue <br />General Plan Designation Professional Administrative Office (PAO) <br />Zoning Designation Professional (P) <br />North Professional offices <br />East Professional offices <br />South Professional offices <br />Surrounding Land Uses <br />West Professional offices <br />Property Size 2.8 Acres <br />Existing Site Development The site is currently developed with a 47,733-square foot multi- <br />tenant office building and associated parking and landscaping. <br />Use Permissions Allowed with approval of a CUP <br />Development Standards Section 41-314 – 41-319Zoning Code Sections Affected <br />Uses Section 41-313.5 (n) <br />Table 2: Development Standards <br />Standards Required by SAMC Provided <br />Building Height 35 Feet Complies; 25 Feet <br />15 Feet (Front)Complies; 55’ Feet <br />5 Feet (Side Interior)Complies; 61 Feet <br />Setbacks <br />10 Feet (Rear)Complies; 45 Feet <br />Parking 1 space per 50 SF of floor area <br />without fixed seats <br />Complies; 99 spaces <br />Project Background <br />The project site was developed in 1968 with the existing 47,733-square foot building, on- <br />site landscaping, and surface parking. The existing building is comprised of three tenant <br />spaces (2909, 2915 and 2917 South Daimler Street). The immediately adjacent units at <br />8/22/2022 <br />Planning Commission 1 – 2
The URL can be used to link to this page
Your browser does not support the video tag.