My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC. (7)
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 3:46:03 PM
Creation date
10/4/2022 11:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
-TETRA TECH, INC.
Contract #
A-2022-158-01
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Molly Mell, PE, ENV SP Education: <br />Construction Support Services <br />Ms. Mell has a diverse base of knowledge of the elements necessary to <br />successfully execute large scale multi -disciplinary projects. Molly has <br />provided construction management and construction support services <br />for a variety of infrastructure improvement projects that involved <br />coordination and community between the agencies, contractor and <br />utility companies. Ms. Mell has had significant roles providing <br />management, coordination and detailed design on a broad range of <br />project types. As a senior project manager, Molly has pulled together <br />successful teams to complete these projects on schedule and on <br />budget. <br />EXPERIENCE <br />BS, Civil Engineering, <br />University of Redlands, 1992 <br />Registrations/Certifications: <br />Professional Civil Engineer, <br />California, No. 59104, 1999 <br />EnvisionTM Sustainability <br />Accredited Professional <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />Port Security Improvements and Modernization Program, Port of 29 <br />Long Beach, Long Beach, CA. 2022 - Ongoing. Program Manager. Years with Tetra Tech: <br />For over a decade Tetra Tech has played an Integral role In partnership 29 <br />with the Port of Long Beach to maintain and modernize Port facilities, <br />infrastructure, security systems, and fiber optic networks. To date <br />Ms. Mall has led over 20 projects valued over $50 million at the Port of Long Beach <br />include: <br />• Security Systems Service, Maintenance and Repair Program <br />• Design -Build Services for Fiber Optic Network Program <br />• Pier G Radiation Portal Monitor Fiber Optic Installation <br />• Port of Long Beach Access and CCTV Non MTSA (2015-16) <br />• Rail and Bridge CCTV Systems <br />These projects <br />On -Call Bridge/Civil Engineering Design and Support, Bureau of Engineering, City of Los <br />Angeles, CA. 2015 - Ongoing. Program Manager. Tetra Tech has maintained a successful partnership <br />with the City of Los Angeles to modernize their aging infrastructure with the goal of mitigating structural, <br />safety, seismic, and aesthetic concerns. To date Ms. Mall has led Tetra Tech teams on six projects for <br />this City of Los Angeles program, these projects include: <br />• Soto St. Bridge over Mission Rd. and Huntington Dr. Bridge Removal and Street Improvement <br />• Taylor Yard Bikeway/Pedestrian Bridge <br />• Riverside Drive Near Zoo Drive Bridge over Los Angeles River, Bridge No. 53C-1298 <br />• Avenue 26 over Arroyo Seco Channel Seismic Retrofit, Bridge No. 53C-1875 <br />• Bike/Pedestrian Path for Los Angeles River Greenway <br />• Century Boulevard Extension Project <br />Public Works Infrastructure Improvement Programs, City of Santa Clarita, CA. 2020. Program <br />Manager. Tetra Tech has supported the City Public Works Department in delivering complex <br />high -profile projects including the Cross -Valley Connector and the Golden Valley Bridge Widening. Our <br />program with the City also included development and implementation of the Bridge Maintenance <br />program and Pedestrian Overcrossing Replacement program. Ms. Mell led five improvement projects <br />within this program including: <br />• El Paseo Dr. Pedestrian Overcrossing Replacement Program <br />• Golden Valley Road Bike Trail Connection <br />• Golden Valley Road/Soledad Canyon Road Interchange Improvements and Grade Separation <br />• Bridge Maintenance Program <br />• Cross -Valley Connector Gap Closure <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.