Laserfiche WebLink
111 H *tM11i[•1:l1IIIIII= <br />Joseph Boyle, PE <br />Principal-in-Charge/Quality Assurance Manager <br />Joe Boyle has 38 years of experience in the planning and design of wastewater <br />facilities, water transmission, distribution, and storage facilities. He has <br />prepared plans and specifications for water and sewer main, storm drain, <br />and roadway design, as well as provided construction phase services. He also <br />has extensive experience in the planning and design of public works projects, <br />including site development, grading and storm drain design, and streets and <br />highways. <br />1989/CA/Professional <br />Engineer/Civil/44497 <br />Experience <br />EDUCATION <br />Walnut Pump Station Upgrade -Santa Ana, CA: Project Manager for <br />1984/BS/Civil Engineering/ <br />the preparation of preliminary design report, plans and construction cost <br />California Polytechnic State <br />estimating for the construction of a new 3,650 SF CMU precision blockbuilding <br />University, San Luis Obispo <br />including the footprint of the existing control building and extending north <br />to enclose the existing outdoor pump station and a small masonry storage <br />EXPERIENCE <br />building. other notable design items included demolition of the existing control <br />With Psomas for 26 years; <br />with other firms for 12 years <br />building and sand trap; the construction of an 8-foot high CMU perimeter wall, <br />10-foot concrete tennis practice wall, two tennis practice courts, 20'x5O'xl4' <br />carport, rerouting of 24-inch inlet line, design of a gooseneck structure to allow <br />groundwater to be manually bypassed around the reservoir to storm drains, <br />electrical equipment and conduits, and site improvements. <br />Well 29 Rehabilitation Engineering Design Services - Santa Ana, CA: <br />Project Manager for the preparation of preliminary design report, construction <br />plans, and technical specifications for the rehabilitation of Well 29. Project <br />scope includes the assessment of the existing well and preparation of technical <br />specifications for well rehabilitation, and design of a new building to enclose the <br />existing well, including a pump room, electrical control room and storage room. <br />The existing pump and 200-hp motor, as well all mechanical equipment, is to be <br />replaced. <br />Orange County Streetcar Project - Santa Ana, CA: Project Manager for the <br />design of the water system facility relocations and installations in support of a <br />four -mile light rail project in the City of Santa Ana. <br />Rehabilitation/Replacement of Pressure Reducing Station Nos. 30, 31, <br />32, and 43 and Construction of New PRS No. 73 - City of Anaheim, CA: <br />Project Manager to prepare construction documents for rehabilitation and/ <br />or replacement of Pressure Regulation Station (PRS) Nos. 30, 31, 32, and 43 and <br />construction of a new PRS No. 73. The existing PR stations were constructed in <br />the 1960's and have experienced significant corrosion and overall deterioration. <br />Design services included preparation of a preliminary design memorandum <br />to establish the basis of design, preparation of construction plans, technical <br />specifications and engineer's estimate. In order to conform with City budgetary <br />numbers allocated for this project, two bid packages are being prepared: Bid <br />Package 1 - PRS Nos. 32, 43 and 73 and Bid Package 2 — PRS Nos. 30 and 31. <br />