Laserfiche WebLink
Joseph Boyle, PE Construction of Well No. S9 and Destruction of Well No. 36 - City of <br />(Continued) Anaheim, CA: Project Manager for preparation of preliminary design report, plans, <br />and specifications for new 2,000-GPM, 250-HP vertical turbine deep well pump <br />equipment; mechanical piping; bypass valve and air gap connection to storm drain; <br />800-AMP electrical service; 810 SF masonry parapet building with roll -away end for <br />well; bulk sodium hypochlorite feed system; HVAC; plumbing; and masonry fencing. <br />As -Needed Engineering Services for the Long Beach Water Department - <br />Long Beach, CA: Project Director for ongoing professional engineering services <br />for numerous water and sewer design plans and contract documents for Long Beach <br />Water Department. Projects include replacement of more than 55,000 LF of 4- to <br />12-inch water mains, sewer rehabilitation and replacements, large diameter (30- to <br />48-inch) valve replacements, and replacement of chemical storage tanks at the LBWD <br />Groundwater Treatment Plant. <br />As -Needed Water Engineering Design Services - Anaheim, CA: Principal -in - <br />Charge for ongoing professional engineering services under as -needed contracts <br />for the City's Water Services Division of the Public Utilities Department. Projects <br />have included a variety of water facilities design projects including pump station <br />upgrades, domestic well pumping facilities, domestic water reservoir mixing <br />improvements, reservoir and pump station condition assessments and water supply <br />assessments. <br />Planning Area 2 (Esencia) Lift Station and SC-6 Flow Control Facility - <br />Rancho Santa Margarita, CA: Principal -in -Charge for preparation of a preliminary <br />design report and construction documents for the SC-6 Flow Control Facility. <br />In order to serve Rancho Mission Viejo s Planning Area 2 of the The Ranch Plan, <br />domestic water was taken from the 60" diameter South County Pipeline near Cow <br />Camp Road and Esencia Street through a new turnout structure designated as <br />Service Connection 6 (SC-6). Domestic water will pass through the SC-6 Flow Control <br />Facility and reduce system pressure as well as control the amount of flow delivered <br />to Zone I and Zone II of the District's water system. Facilities included a new masonry <br />building housing the flow control equipment, as well as a metering vault containing <br />24" meter and related mechanical piping and valves. Psomas was responsible for <br />preparing construction plans, technical specifications, bid documents and providing <br />construction phase engineering services. <br />Parkview Pump Station Expansion Project - Anaheim, CA: Principal -in -Charge <br />for design of an expansion to the Parkview Pump Station to increase the capacity <br />from 4,500 to 9,500 gpm. Psomas' responsibilities included design report preparation, <br />preparing contract documents, cost estimates, permit processing and bidding and <br />construction phase services. Principal -in -Charge for preparation of preliminary <br />design report, plans and specifications for construction of new domestic water pump <br />station with two 200 hp vertical turbine pumps with 5,000 GPM pumping capacity, <br />masonry block building, mechanical piping, electrical, SCADA, site improvements, <br />propane fuel system and retaining wall. <br />