My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (2)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:56:35 AM
Creation date
10/4/2022 11:02:32 AM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2022-158-03
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
10/15/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
David Moritz, PLS Sullivan Canyon Survey - SoCalGas Lines 407 and 3003 - Los Angeles, <br />(Continued) CA: Project Manager for the following civil engineering and surveying services: <br />design roadway grading and hillside drainage/inlet repairs, develop erosion <br />control mitigation measures along roadway, process local agency permits with <br />regulatory agencies, performed control surveys, boundary and right-of-way surveys, <br />topographic and design surveys, aerial mapping (digital orthophotography and <br />traditional photogrammetric mapping), designation of staging areas and pipeline <br />dig locations, construction support, construction staking; and DFG and RWQCB <br />environmental impact area calculations. <br />Line 1600,1601, 2010 and 3011 Retrofit Project - San Diego County, CA: <br />Survey Manager for surveying and mapping services for this 60+ mile pipeline <br />retrofit project to prepare pipelines for pigging operations. Project required valve <br />replacements, design surveys, pressure limiting stations, and interconnect pipelines <br />tying into existing Company lines. Responsible for control surveys; design surveys; <br />topographic surveys; locating and marking property lines, rights -of -way, easements <br />and pipeline features; preparing legal descriptions; creating design background to <br />be used by SDG&E design engineers for additional in-house design work; as -built <br />surveys; preparation of completion drawings; pressure regulating station staking; <br />environmental survey impact limit staking; and pipeline detection and alignment <br />surveys. <br />PSEP Hydrotest Pipeline Inspection Survey/GIS Alignment Sheet Generation <br />- Blythe to Los Angeles, CA: Survey Manager for survey/GIS services on this <br />250-mile pipeline with approximately 20 miles classified as Category 4 segments <br />including coordinating and providing field surveying for topographic mapping and <br />high/low point elevation locations, boundary and right-of-way mapping, subsurface <br />utility research and mapping. Performed collection of ILI pipeline inspection data, <br />field survey data, and gas company asset data to produce alignment sheets for <br />transmission pipeline extending from Arizona to Los Angeles. The sheets were <br />mapped for hydro test sections along the route. <br />North -South, 63-Mile, 36-Inch-Diameter Pipeline - Riverside, CA: Survey <br />Manager for survey, engineering, and project management services to Southern <br />California Gas Company for the North -South Pipeline project which includes a <br />63-mile, 36-inch natural gas pipeline from Adelanto to Moreno Valley. The North - <br />South Pipeline project progressed in phases that included creation of environmental <br />base maps, plan and profile base maps, permit drawings, detail (IFB) drawings and <br />construction drawings. Survey Manager providing surveying and mapping services <br />in support of preparing Environmental Base Mapping, Plan/Profile Base Drawings, <br />geotechnical, pothole and other special design survey support. Just recently, the <br />Psomas team under Dave's leadership finalized the Environmental Base Mapping <br />phase of the project both on time and under budget. His team has begun the next <br />phase of the project to support the design and base mapping efforts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.