Laserfiche WebLink
TA'T&Ans o d otes, \nz. <br />On -Call Water Resources Engineering Services <br />Pipeline Management P.,og1"--100'FV121019-9020- <br />Phase- <br />" as�� Project <br />Glendale Water & Power, Glendale, CA <br />TAITwas contracted tuprovide design build services with ]D[for the <br />potable waterline project within the various residential neighborhoods of <br />Glendale, CA. The project was located inthe residential streets |nanarea <br />of Glendale which required our team to develop construction documents <br />that could accommodate traffic during construction and adesign that <br />would work with many existing utilities. The design involved the <br />preparation ofplans and specifications for approximately 9,9S1linear feet <br />ofO'inchwater pipeline and 1,S84linear feet of12-|nchwater pipeline. <br />TAITprovided the design services along with topographical survey ofthe <br />neighborhood. Due tothe numerous existing utilities and mains within <br />the project, detailed designs were provided toensure adequate clearance <br />between all utilities. TA|Tmet and discussed with many ofthe utility <br />surveyors inorder toensure the final design and construction was <br />approved byall. <br />Pipeline :��a������ �en�Program, ��� 0 18_ <br />el <br />Glendale Water & Power, Glendale, CA <br />TAIT was contracted tuprovide design build services with ]D[forthe <br />potable waterline project within the various residential neighborhoods of <br />Glendale, CA. The project was located |nthe residential streets inanarea <br />ofGlendale which required our team todevelop construction documents <br />that could accommodate traffic during construction and adesign that <br />would work with many existing utilities. The design involved the <br />preparation ofplans and specifications for approximately l2,40Glinear <br />feet of8'incbwater pipeline and 48Dlinear feet of1Z-inchwater pipeline. <br />TAITprovided the design services along with topographical survey ofthe <br />neighborhood. Due tothe numerous existing utilities and mains within <br />the project, detailed designs were provided toensure adequate clearance <br />between all utilities. TA|Tmet and discussed with many ofthe utility <br />surveyors innrdertoensure the final design and construction was <br />approved hyall. <br />Reference Contact: <br />Maria Fraser, PE, OP <br />Engineering Manager <br />13Z2OCentral Avenue <br />Chino, [A8171D <br />(909)334-3310 <br />Client: <br />City ofChino <br />Construction Cost: <br />$2.1miUion <br />Design Cost: <br />$134,998.75 <br />Project Dates: <br />1018=2U22 <br />Project Teem: <br />P|[:Jacob Vandervb <br />PM: David Sloan <br />PE: Bart Mink <br />Reference Contact: <br />Coleman Johnson <br />141N. Glendale Ave. <br />Glendale, CA9IZ05 <br />(818)551'6910 <br />Client: <br />Glendale VVater&Power <br />Construction Cost: <br />$4.4 million <br />Design [mm- <br />519BJ96 <br />Project Dates: <br />Dedgn:2Ul9-20I0 <br />[onstpucdon:2O2O <br />Project Team: <br />PIC:Jacob Vandenjs <br />PM/PE: SamantbaVVohMarth <br />CA/QC: David Sloan <br />