Laserfiche WebLink
TA|TQk4aoocia+es,inc, <br />Dn-[aHVVaterResmurceoEngineehng Services <br />C�`��� �111ey San <br />^ tat" oK&/ReliabiUitat-on Projects; SA-161 & SN191 <br />- <br />TAITprovidedfoUnecnns mctiondssignandsurveyngse/vcestothe[ity <br />ofChino for nine (9)separate alley segments comprising ofapproximately <br />8,500 lineal feet of existing alleyways, protection of existing above ground <br />utility appurtenances, P[[alley approaches, PC[ADAcurb ramps, P[[ <br />ADAsidewalks, proposed bu|b-nuts'damaged water meter box <br />replacements, and approximately 2'65OLFofa new 8" PVC waterline <br />replacing asimilar length of5O+year old 6~A[Pline within one alley. The <br />City required that all points oJconnection 1mthe existing systems running <br />along crossing alleys be upgraded to include the newer and larger PVC <br />water pipe and the installation ofnew water values ineach cross alley. <br />Many ofthe segments between cross alleys required obtaining approvals <br />from the State Division ofDrinking Water due to restricted vertical <br />clearances between existing utilities installed in the narrow alley, The <br />contractor |scurrently finalizing final punch list nnthis successful project <br />this month, April ZOZJ. <br />City of Chino, CA <br />TA|Thas provide design services tothe City ofChino for approximately <br />7U00linear feet ufnew 8'inchPVC water line replacing asimilar length of <br />SU'yearold 6'incbA[Plines within 13residential street. Over 17O <br />customers will beaffected during construction. The City required that all <br />poi ntsofuznnec1iontobeup8raded toiuc|udethenevverand|argerPVC <br />water pipe and the installation ofnew water values in each cross street. <br />Eight ofthe thirteen segments require obtaining approvals from the State <br />Division of Drinking Water due to restricted horizontal clearances in the <br />narrow residential streets. To assist the City in meeting an early delivery <br />schedule for one oftheir current water projects Quadrant III water plans <br />were separated into two separate bid contracts. The first segment ofIDOO <br />LFwas recently awarded atalow bid price of$990'O00and construction <br />commenced inApril ZO10and completed in6months. The second bid <br />package received City authorization toadvertise inFebruary 2O18and was <br />constructed in2O18. <br />Client: <br />Glendale Water &Power <br />Reference: <br />KevinRumzer <br />I4lN.Glendale Ave. <br />Glendale, CA91706 <br />(8I8)551'6910 <br />Construction Cost: <br />Approx. 51.69M <br />Project Dates: <br />Design:3O16-20l7 <br />Construction: 2017 <br />Project Team: <br />P|C/PK8:Jacob Vandemis <br />QA/Q[:Todd Schmieder <br />PE: SamanthaVVmhKarth <br />Client: <br />City ofChino <br />Reference: <br />LupeCamado <br />132ZOCentral Avenue <br />Chino, CA9171O <br />Ica macho 2L��ino,org <br />(909)334'3406 <br />ConstrucdonCos: <br />$23 million <br />Project 0atey� <br />Design: May 20l7-Jan.2018 <br />Comstructimn:2O18 <br />Pro]ectTearn: <br />P|[�Jacob Vanderx|s <br />PM: Todd Schmieder <br />PE: Samantha VVuhKurth <br />[A/QC: David Sloan <br />Page |9 <br />