My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:58:15 AM
Creation date
10/6/2022 9:45:15 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2022-158-06
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />o s, 4nc_ <br />t On -Call Water Resources Engineering Services <br />ecyc'ed Water Project <br />Glendale Water & Power, Glendale, CA <br />AIT was contracted to provide design build services with JDC for the <br />recycled water project within the Glenwood residential neighborhood and <br />surrounding schools. The project was located in residential streets in an <br />area of Glendale which required ourteam to develop construction <br />documents that could accommodate traffic for three public schools and a <br />design that would work with many existing utilities. The design involved <br />the preparation of plans and specifications for approximately 5,890 linear <br />feet of 8-inch recycled water pipeline to bring recycled water to GWP's <br />customers in the area. In addition, the project provided enough capacity <br />for future extension and expansion. TAIT provided the design services <br />along with topographical survey of the neighborhood. Due to the <br />numerous existing utilities and mains within the project, detailed designs <br />were provided to ensure adequate clearance between all utilities. <br />f. References <br />City of Chino <br />Lupe Camacho <br />(909) 334-3406 <br />13220 Central Avenue, Chino, CA 91710 <br />Projects: Quadrant I// Water Main Replacement <br />Reference Contact: <br />Kevin Runzer <br />141 N. Glendale Ave. <br />Glendale, CA 91206 <br />(818) 551-6910 <br />krunzerf-Elend'aleca.gov <br />Client: <br />Glendale Water & Power <br />Construction Cost: <br />3.1 million <br />Project Dates: <br />Design: 2018-2019 <br />Construction: 2019 <br />Project Team: <br />PIC/PM: Jacob Vandervis <br />PE: Samantha Wohlfarth <br />QA/QC: Todd Schmieder <br />Glendale Water & Power <br />Andy Cheung <br />(818) 551-6909 <br />141 N. Glendale Ave., Level 4, Glendale, CA 91206 <br />Projects: Hoover, Toll, Keppel Recycled Water Project, Kenneth and Ben Lomond Water Main Replacements <br />Project, Adams Hill Neighborhood Water Main Replacement Project Beaudry Terrace Water Main <br />Replacement Project <br />Golden State Water Company <br />Conde Ventura, PE <br />(310) 436-6950 x102 <br />630 E. Foothill Boulevard, San Dimas, CA 91773 <br />Projects: Foothill District Water !Main Replacements, Normandie Ave. plater Main Replacement <br />(�� -� Page 1 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.