Laserfiche WebLink
Below is a sample Scope of Work from a recent successful Water Main Replacement Project. <br />Samp-e Scope of Work <br />A As -Built Research, Investigation aod Review <br />Review of record Information provided from the City files will be conducted tnverify existing field <br />conditions. TAIT will also research and acquire existing available design records and utility <br />information. It is anticipated that the information collected during the research phase will be used <br />toassist |nthe development ofthe project base maps. <br />The records research will include obtaining records from the City, utility providers and all other <br />jurisdictions within the project limits, |naddition, TA[Twill document, contact, and coordinate with <br />other public and private agencies/entities/jurisdictions involved to inform them about the project <br />and obtain their records, approval, and permit requirements, arapplies. <br />Obtained records will be reviewed and correlated with the Topographic and aerial (Bing Map) data <br />in order to prepare the final project Base map. <br />Deliverables: <br />11 Digital Copies Records, Field Notes, Observations, & Photos <br />B Utilitv Research & Not�ficti;n <br />Utility Notices ' <br />At project inception, TAIT will conduct utility research through Dig -Alert and City records and <br />will prepare and distribute the 1st utility notifications which will identify the project intent, <br />limits, and general scope of work and will request that each utility provide our office with the <br />associated As -Built records for the project limits, TA|Twill review and compile the received <br />responses in to the project Utility matrix for tracking of existing utilities and conflicting facilities, <br />Upon completion ufthe 6O%design, TA[Twill distribute a2ndnotice toall present utilities and <br />will include acurrent set ofplans for the utility's review and comment. All foreseen utility <br />relocations or conflicts will be identified in this notice for the Utility's review and action. TA|T <br />will actively coordinate with all utilities inorder tmensure all relocations are coordinated and <br />completed prior 10the start ofthe [ity'sproject. <br />The final notice will be sent at the design completion stage and will include a signed print of the <br />plans for the utilities records. TA|Twill review all obtained record data and will coordinate with <br />utilities that may beaffected inorder toobtain further design and construction requirements. <br />All utility coordination, records and data will be compiled at the end of the project and will be <br />submitted tnthe City for future reference. <br />Uflility Records & Base map <br />Page 1 11 <br />