My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:58:15 AM
Creation date
10/6/2022 9:45:15 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2022-158-06
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��|T&Aasociateo Inc,On-Call Water Resources Engineering Services <br />This task includes the necessary hours for providing limited construction assistance to the City <br />during the construction phase. TAU - will remain available tothe City and will respond to <br />Contractor RRsbased onthe [it/xrequest. TA|Twill also review and provide responses to <br />Contractor submittal documents during the construction phase. |tisassumed that the Oty's <br />construction manager will take the lead role in reviewing submittal documents and that TA|Twill <br />play an assisting role for the submittals that require further attention to detail. For budgeting <br />purposes, this task has been assumed to be billed in a time and material basis. Additional hours <br />and fees will be requested based on the final number of RFIs and submittal review and <br />construction correspondence required during the construction phase. <br />Deliverables: <br />/ Written Response tuRHs(As needed) <br />• Stamped and Reviewed Construction Submittal Documents (As Needed) <br />As -Built Plans <br />Upon completion o[the construction phase, TAITwill incorporate the City provided redlines <br />from the Contractor and the Inspector in to the design plan set in orderto prepare a final As - <br />Built document for City records. All field changes will benoted via rev cloud and delta note 10 <br />indicate As -Built revisions. Plans will be prepared and submitted in PDF format to the City for <br />initial review and acceptance. <br />/ As -Built Plans (PDF Copy) <br />Per RFPrequirements, atotal ofSmeetings have been assumed aspa/tofthistaak. A1aminimum, the <br />following meetings are assume <br />Design Kickoff Meetin <br />A design kick-off meeting with TAIT's key team members, City staff, and other affected parties, <br />will be held at the start of the project to identify clear lines of communication and review the <br />final scope, schedule, milestones and other project details ofconcern. |tisanticipated that the <br />City will provide pertinent record information for the existing streets and utilities including as - <br />built plans for the project limits. |tisalso understood that the City will provide standard <br />drawings, templates, and City design standards toTA|Tatthis time. Based on our actual NTP <br />date, TA|Twill prepare and present amupdateofour project schedule. TA|Twill also prepare a <br />meeting agenda for initial circulation. Upon completion ofthe meetings, TA|Twill prepare <br />meeting minutes for circulation, review and comments. All meeting agendas, minutes and <br />exhibits will be filed inour project folder for final submittal 1uthe City atthe completion of the <br />project. <br />/ rA/T Page] 18 <br />�._-_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.