My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:58:15 AM
Creation date
10/6/2022 9:45:15 AM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC
Contract #
A-2022-158-06
Agency
Public Works
Council Approval Date
8/16/2022
Expiration Date
8/15/2025
Insurance Exp Date
9/1/2023
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i, - so= ates, inc. <br />q On -Gall Water Resources Engineering Services <br />17 storm drain pump stations were constructed prior to County of Orange's 1986 Hydrology Update, <br />which rendered many of the existing drainage infrastructure deficient. With no dedicated funding <br />source, Federal Grants have been utilized to improve this infrastructure. <br />Alabama Storm: Drain Upgrade project, Engineer of Record/Principal-in-Charge, 2008 <br />Served as Engineer of Record and principal in Charge of the Alabama Storm brain project to upsize <br />approximately 2,200 lineal feet of storm drains. The project utilized a Federal Community Development <br />Block Grant to fund the construction and required a Coastal Development Permit, <br />Meredith Storm Drain Project, Principal -in -Charge, 2016 <br />Principal in Charge for the Meredith Storm Drain project, which upsized approximately 500 lineal feet of <br />storm drains and adjacent catch basins. <br />Shields Pump Station Project, Project Manager, 2001 <br />Served as Project Manager for the Shields Pump Station Rebuildoverseeing the consultant design for <br />replacement of the pump station, which was land locked and required construction during the rainy <br />season, <br />Heil Avenue Pump Station Project'. Principal in Charge, 2020 <br />Principal in Charge over consultant designed pump station. This project was funded by a Federal Pre - <br />Hazard Mitigation Grant, which required a benefit cost analysis as part of the application process. The <br />project was shelf ready awaiting final FEMA authorization to proceed. <br />Meredith Pump .Station Building Expansion, Principal in Charge, 2016 <br />Served as Principal in Charge overseeing the consultant design for the expansion of the Meredith Pump <br />Station building to accommodate larger pumps. <br />Beach Outlet eater Quality Project, Engineer of Record/Principal in Charge, 2004 <br />Served as Engineer of Record and Principal in Charge for construction and installation of CDS gross <br />pollutant separators at 12 beach and wetland' outalls. This project was funded by a State grant due to <br />higher -than -normal ocean bacteria levels in the early 2000's. <br />Abridged List of Additional Project Experience by Todd: <br />Arterial Rehabilitation, Engineer of Record/Principal in Charge, 2002-2021 <br />Residential Overlay, Engineer of Record/Principal-in-Charge, 2011-2021 <br />Alley Rehabilitation, Engineer of Record/Principal-in-Charge, 2015-2021 <br />Atlanta Street Widening Project, Principal -in -Charge, 2019 <br />Newland Street Widening Project, Principal in Charge, 2010 <br />Beach Blvd. @ 1-405 Thru-Lane Improvements, Principal in Charge, 2015 <br />j� __ Appendix 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.