Laserfiche WebLink
Education <br />8.I—Civil Engineering <br />Valparaiso University <br />Valparaiso, IN, 2012 <br />Year mfTAIT Team <br />Enlistment <br />2012 <br />Total Experience <br />10 <br />Certifications. <br />Professional Engineer <br />California No. 86126 <br />TA|T&Assndateo, inc, <br />On -Call Water Resources Engineering Services <br />Sama0-tha/McGee\Woh1farth P.E. <br />PROFESSIONAL ENGINEER -WATER <br />Ms. VVoh1farth has professional experience that includes the preparation of <br />grading plans, water main replacement plans, storm drain plans and drainage <br />reports sewer plans, cost estimates and storm water management reports for <br />public and private developments throughout Southern California, Western <br />Washington, and North Dakota. Her project experience also includes the <br />preparation of storm water quality reports such as SWPPP, WQMP, SUSMP and <br />LID nsmandated bythestate and local municipalities. Ms. VVohKartbhas <br />technical knowledge with multiple software programs including AutoCAD 2014, <br />Civil 3D, Land Desktop, K4icrostation,6eoPak,VVVVH01ZU1Z, RetainPnu, and <br />additional specialty programs. <br />Pipeline K8enagenmemt'Program, FY2Qlg-2020Phase 1Project <br />Glendale Water Q^Power, PnjertK0amager/Engineer 2019-2020 <br />TA|Twas contracted toprovide design build services with ]D[for various <br />neighborhood water main replacement projects. The project required the <br />replacement of approximately 11,535LF of existing ACP water pipe within 8 <br />local streets, while working in residential streets and incorporating design that <br />would work with many existing utilities. The process included obtaining DDW <br />approvals for many ofthe segments. <br />Pipeline Management Program, FY2D184ZO19Phase 1PMiect <br />Glendale Water &Pomxer,Project &0anager/Engineer 2010-2019 <br />TAIT was contracted to provide design build services with JDC for the Pipeline <br />Management Program, FY2018-2019 Phase 1 water main replacement project. <br />The project was located in residential streets in various areas of Glendale which <br />required our team to develop construction documents that could accommodate <br />traffic while working in residential streets and a design that would work with <br />many existing utilities. <br />Chino Quadrant |HA,B~and CWater UneRepscen�entProject[�yofChino <br />Project, Project K8emager/Engineer 2017�2018 <br />This City project required the replacement of approximately 800OLF of existing <br />G-inchA[Pwater pipe with new 8-inch PVC water pipe within13 local streets for <br />the City. The process included obtaining DDVVapprovals for 8nfthe 14 <br />segments. <br />Nooue�-,Toll, Neppe Recycled Water PrOject G|emda|eWater GkPower, Project <br />Manager/Engineer, 2016-2017 <br />TAIT was contracted to provide design build services with JDC for the recycled <br />water project within the Glenwood residential neighborhood and surrounding <br />