Laserfiche WebLink
Garry Avenue Business Park at 1700, 1720, and 1740 E. Garry Avenue <br />October 10, 2022 <br />Page 3 <br />2 <br />8 <br />7 <br />1 <br />In addition to the new structure, the site will be improved with new landscaping, paving, <br />onsite parking, and improvements to the public right-of-way. The improvements include <br />onsite landscaping and a landscape edge along the SR-55 Freeway that takes into <br />account the freeway’s future widening, scheduled to begin in 2022. In addition, the project <br />site will provide 145 onsite parking spaces, an onsite employee amenity area, enhanced <br />paving at driveway entrances, new curb and gutter, street lights, and paving along the <br />project frontage on Garry Avenue. Although not required, the project will provide an onsite <br />walkway for pedestrians along the project frontage. <br />The design of the structure is contemporary, with exterior finishes that would enhance the <br />building’s presence along the SR-55 Freeway. The building will contain a mixture of <br />materials, including performance vision glass, metal awnings, and concrete panels <br />painted in white, various shades of tan and brown, and soft green hues. The building’s <br />elevations have been designed to allow for placement of future wall signage to ensure <br />compliance with applicable Santa Ana Municipal Code (SAMC) requirements. The project <br />is intended to be constructed in a single phase. <br />Project Analysis <br />Table 2: Conformance to Light Industrial (M1) Development Standards <br />Standards Required by SAMC Provided <br />Building Height Unlimited if in Height District II Complies; 43.5 Feet <br />Minimum Lot Size and <br />Street Frontage <br />12,000 square feet size and <br />100 feet of street frontage <br />Complies; 223,463 square <br />feet and 330 feet <br />10 feet if along a non-arterial <br />roadway <br />Complies; 26 feet providedSetbacks <br />None along side/rear property <br />lines <br />Complies; 10-foot landscape <br />buffer provided at east, south, <br />and west property lines <br />Parking 1 space per 1,000 square feet <br />for warehouses with <br />distribution services <br />Complies; 92 parking spaces <br />required and 145 parking <br />spaces provided. Of these, the <br />developer will construct 8 <br />spaces for use by the adjacent <br />property, to be accessible via <br />a recorded easement, to <br />ensure ongoing compliance <br />with SAMC parking <br />requirements <br />Landscaping Minimum 5-foot landscape <br />strip along non-arterial <br />roadways, and Minimum 10- <br />foot landscape strip where <br />abutting non-industrial <br />properties <br />Complies; 26 feet provided <br />along Garry Avenue and 10 <br />feet provided along east, <br />south, and west property lines <br />10/10/2022 <br />Planning Commission 2 – 3