My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_10-10-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
10-10-22
>
Packet_10-10-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 1:11:47 PM
Creation date
11/7/2022 1:10:44 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garry Avenue Business Park at 1700, 1720, and 1740 E. Garry Avenue <br />October 10, 2022 <br />Page 4 <br />2 <br />8 <br />7 <br />1 <br />Standards Required by SAMC Provided <br />Screening Minimum 8-foot high wall <br />required where loading <br />activities occur <br />Complies; 10-foot high wall <br />proposed at south property <br />line to screen loading docks <br />from Alton Avenue right-of- <br />way <br />Floor Area Ratio (FAR)Maximum 3.0 Complies; 0.43 Proposed <br />As shown in Table 2 above, the proposed project meets the development standards of <br />the proposed M1 zoning district designation for which a change in land use classification <br />from Professional to Manufacturing is being sought. Additionally, the project and site plan <br />have been designed to minimize impacts onto surrounding properties by placing the <br />building’s loading docks to face south toward the vacant Alton Avenue right-of-way to <br />minimize noise and aesthetic impacts onto adjacent developed properties. The site plan, <br />as designed, would continue to meet development standard of the M-1 zone if Caltrans <br />builds the Alton Avenue bridge over the SR-55 Freeway by providing a solid screen wall <br />with 10-foot wide landscape buffer along the freeway, which will allow for mature trees, <br />shrubs, and groundcover to be maintained long-term along the westerly (freeway- <br />adjacent) property line. <br />Lastly, the project site is in an area identified by the General Plan for industrial uses, <br />pursuant to the Industrial/FLEX land use designation. Vehicles and trucks entering and <br />departing from the project site will not travel through any neighborhoods containing <br />sensitive land uses, such as residences, schools, or parks. The new General Plan also <br />designates surrounding properties Industrial/FLEX, and Garry Avenue and Pullman <br />Street provide direct access to the SR-55 Freeway by way of the Dyer Road interchange, <br />a driving distance of half a mile (0.50 miles). <br />Amendment Application <br />The subject site is zoned Professional (P). The development standards pertaining to the <br />Professional zoning district would render the project unfeasible, as warehousing and <br />distribution uses are prohibited by the P zoning district. Approval of an amendment <br />application to change the zoning district to Light Industrial (M1) is required for the project. <br />The General Plan identifies on Table LU-A-1 that the Interim Development Standard for <br />the FLEX-3 area is M1. The project has been designed to conform to all applicable <br />standards of the M1 zoning district. <br />Although warehousing uses are permitted by-right in the M1 zoning district, distribution <br />uses require approval of a conditional use permit (CUP) by the Planning Commission. <br />The zoning district designation of M1 enables the applicant to submit the required CUP <br />application for consideration by the Planning Commission to permit or conditionally permit <br />the proposed distribution use. <br />10/10/2022 <br />Planning Commission 2 – 4
The URL can be used to link to this page
Your browser does not support the video tag.