Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO,: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICE$FOR PFAS TREATMENT SYSTEMS <br />The Consultant shall provide cost estimates for The treatment facility equipMenl, any <br />necessary rand acquisition to accommodate a treatment systems), permitting, plumbing <br />connections, transmission alignments and system integration The Consultant shall also <br />include capital. maintenance and operation coal estimates ter IX treatment system(s). <br />F. PRELIMINARY SCHEDULE <br />The Consultant shall develop a preliminary phasing schedule for construction in the <br />Planning Study. The plan is intended to provide the City a schedule and projected annual <br />outlays for FnanraaI planning- In the preliminary schedule, the Consultant shall include the <br />anticipatedduration of caonstruotion as well as any necessary utility extensions required. <br />G. FINAL REPORT <br />The fnar report shall Include i;tiscussion of all items listed herein and shall be submitted <br />to the City for review and Gbmments. The Consultant shall provide a P❑l• digital copy of <br />the preliminary report and shall incorporate all comments made by the City prior to <br />submiKing of the final report. <br />In addition to the aforementioned items, the final report shall also include one or more <br />sections summarizing major findings, any significant challenges or common themes <br />relevant to the iCity's system, and reco miend any future actions by the City as next staps <br />towards PFAS treatment implementation. The report shall contain descriptions of <br />vpefaWn and maintenance such as IX resin frequency of change out, equipment details, <br />sampWana,lysis frequency, and what staff augmentatioNoertlflcation is required, <br />2. DESIGN PHASES <br />Once the planning Study has been completed, the Consultant shall provide design services <br />irbdudin9 preparation of design sheets, specftations and permitting. Al submittalls described <br />herein shall be provided in the form of a P❑F digital copy (fulksiaze). The design phases shall <br />include, but are not limited to the following; Items, <br />A, t)RAFT DESIGN REPORT (10% DEMN SUBMITTAL) <br />The Contractur is required to create a Preliminary Design Report (PDRj based on the <br />Planning Study for each trealrneiM site requested by the City. The POR shall be raansidefed <br />a 10% design level package forthe piiojeot in which the IX wellhead treatment project goals <br />and design criteria are addressed with alternatives, analysis and potential risks. <br />B. FINAL DESIGN REPORT (30% DESIGN SUBMITTAL) <br />After the City defines the major design elements of the project and refines the projot's <br />scoM schedule and budget expressed in the preliminary design report. the Consultant shall <br />develop the Rnar Design Report- The Final Design Deport shall be considered a 30% design <br />- -- Qity cf 13anta Ana RFP22-133 <br />on -Cali E ngineer rig [Design services rm PFAS Trealrnent Systemt <br />City Council page I i 19 — 212 4/4/2023 <br />