My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO- 22.133 <br />GM -GALL ENGINEERING DESIGN SEMACES FOR FFAS TREATMrEN SYSTEMS <br />levgl package for the project in which the IConsuMM provides a refined project budget. cosl <br />estimate and project schedule that the City Can commit to- Land acquisitions, fatal flaws, <br />and the finalized design criteria shall be incorporated into the Final Design Report, <br />C. 60% DESIGN SUBMITTAL <br />After receiving and incorporating comments provided by the City on the 30% Design <br />Submittal, Ifte Conlraclor shall provide an updated 60% Design Submittal in which <br />expectations and objections are finalized of the project as; well as confirmation of <br />constructoW ty+ and permit requir ments. The Consultant shall also provide plans and <br />specifications as will as an engineering cost estimate. The Consultant sha It also implement <br />acoeptabre value engineering requirements (it applicable) and idenlify preferred equipment <br />and matertars. <br />D. 00%RESIGN SUBMITTAL <br />The Contractor shall provide 90% Design Plans with the complete pm)ect design, including <br />plans and ,specifications, subject to review comments by the City and any other potential <br />stakeholders. The 90% Design Package shall confirm the bid availability of the project, <br />possess an engineer's cast estimate for the bid, and finalize the building permit package <br />(when app6rable). The Consultant shall also provide a Commissioning Plan in the 90% <br />Design Submittal in which the goals, systems, and commissioning processes are iden4fied- <br />E. FINAL DESIGN i100% DESIGN SUBMITTAL) <br />In the final design submittal. Ihe Contractor shall incorporate all comments and requests <br />made by the City in previous design submittals and shall include, but is not limited to the <br />following; <br />L Cost Estimate, Specifications and Prajact Schedule: <br />a. Final construction schedule and estimate of construction duration <br />b. Construction phasing plan <br />c. Final construction staging plan with access to construction staging area <br />obtained or final staging area to be obtained <br />d, Final commissioning plan <br />e. Engineer's cost estimate for bid and backup documentation <br />f, All land permits received <br />g. Complete set of stamped permit application drawings arrd documents <br />h. Complete set of project permit applications excluding Contractor obtained <br />hermits <br />I. Complete set of technical specifications <br />j- Gamplete list of special conditions related to oonstructlon <br />ll. ArchitacturW system (It Applicable} <br />a, Complete set of architectural drawings <br />ty 01 Sonia Pura RFP 22-1-33 <br />On -Call <br />City Council <br />17 19-213 <br />4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.