My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Agenda Packet_2023-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 10:04:20 AM
Creation date
3/29/2023 9:54:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY DF SANTA ANAr <br />RFP NO.: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PFAS TREATMENT SYSTEMS. <br />b. Final architectural detaft— coordinated with structural system details <br />c. Special construction details completed <br />0- Complete ceiling plan <br />e- Interiorequiprnent <br />I. Room finished schedule including,. <br />i. Golor selection <br />ii. Ftaar selection <br />ili, 'Wall fnlsh <br />IV. Ceiling finish <br />Door schedule —including hardware. master key plan working with the City's <br />aCoess Control speciatigt <br />Window sCl'redule including hardware <br />Architecturar accessories schedule <br />Exterior finish and Color schedule <br />III. Structural System <br />a- CcimpWe set of structural drawings <br />b_ Final structural details coordinated with architectural system details (if <br />aipplicable� <br />c. Permit set of stamped structural calculations <br />d. Final foundation and footing details <br />e. Final structural details including oonstruclinn details <br />f. Find structural calculations <br />g. Performance requirements for shoring system identified <br />IV. Civil Site Plan System <br />a. Final estimate of fill and excavation quantities <br />b. Location of new utilities finaiiaed <br />c. Utility connections finalized <br />d, Final design of water treatment facilities <br />e- Final chaiinelization planks <br />f_ Final signing plans <br />g. Final landscaping plans (if applicable including plant schedule) <br />h. Final irrigation syslern plans <br />i. Final erosion and sediment control plans <br />j. Final design of traffic mitigation <br />k. Permit set of stamped storm water ma nagernent calculations <br />1. Surface Water Pollution Prevention Plans (S PPS) when applicable <br />V, Mechartical System <br />a. Complete equipment schedule <br />In. Final piping plans <br />c_ Final heating, ventilation and air conditioning (HVAG) plans <br />d. Final plumbing plans <br />a. Final fire protection plans and performance specifications <br />City of Santa Ana RFP 22-133 <br />on-Caii <br />City Council <br />Is 19-214 <br />4/4/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.