My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIROMENTAL
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIROMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:54:40 AM
Creation date
5/3/2023 3:20:45 PM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIROMENTAL
Contract #
A-2023-053-03
Agency
Public Works
Council Approval Date
4/4/2023
Insurance Exp Date
5/24/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN f'A AhlA <br />RFP NO,: 22--li33 <br />ON -CALL ENGINEERING DESIGN SET VIC31:5 FOR PTAs Tf2Fu'1WE T SYS't'RMS <br />The Consultant shall provide cost estimates for the treatment facility clriuipam,ent, any <br />nPoossary land acquisilio n to a oDomranodaite am Ireatment syslenn(s), permitting, plumbing <br />conner.Ai'o ns, transmission allgjnments- and system integration- The Consultant shell also, <br />include c;apilal. maintenance and operation vast oslirmates for IX trealment system(s}, <br />F. PRELIMINARY SCHEDULE <br />The Consultant shall develop a pml minary phasing s ,latadunle for construction in the <br />Plei nnirig Sturdy. Tura plan is intended to pprovida Ilie City.a schoduie and projected annual <br />OLalay6 rorfinaincial planrning.In tlaeprelinrinaryschedule, lho Cons;ultauaishall include the <br />anticipated duration of construction: as well as any necessary ullfity oxtensions required. <br />G. Ftl+ AL REPEtRT <br />The final report small Includo discussion of all iteMaL Ilsleci herain and ahall tie submiltrd, <br />to the Cily for review and comments, The Consullant shall provide a PDr +digital copy of <br />the preliminary report and shall incorporate all carrinients made by the City prior to <br />surbmilling of the final report <br />Ira a,drlitfon to the aforementioned items, the final report shall :also includ'er vne or more <br />sections 4urnmarizing major findings, any significant challenges or common themes <br />relevant to ilia City"s system, and recorrrrnarnd any futurn artions by the City as nuxt steps <br />towards PFAS treatment implementation, The report shall contain descriptions of <br />operation and maintenance surch as V rosin frequency of eliatnge out, equipment details, <br />s;amplafarnallysis freciuency, and ~+that staff augmentallienicertiticatio n is requtrod, <br />Once the Planning Study has been comptolerl, the Consultant shall provide design ser`Ace,5 <br />Including preparation of design sherals, spua6lications and permitting. All sutanlittals described <br />herein shall be provided in the Form of a PDF digital ropy (full -sire), The desirgrn pahasrrs: shall <br />include, but are not limited to the following; items,: <br />The Contractor is required to, create: a Praliminary Design Report (PDR) )rased on the <br />Planning Study for each trealrne,nt site: requested by the City. The Part shall be consIderod <br />a 11; % design level pyackago for the project in wfdoh the I.X. avr4Ilhe7,d Imalment project goals <br />and. design criteria are addressed with alternatives, analysis and potential risks:, <br />8. FINAL DESIGN REPORT (30% DESIGN SUBMITTAL) <br />After the City defines the major design elements of tlae project and refines file projer. is <br />shape, schedute and budget expresser) in the preliminary design report, the Canstailamnt shall <br />develop the Final Design Report. The Final resign Report shall be considered a 30% design <br />Oily of Scrim A n pi ll 1?2-133 <br />On -Call t'nlnl eoring Duuign, Sarvirei fm PFAy Troaim ant Sysicais <br />Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.