Laserfiche WebLink
ITS'" OF SANTA AN <br />RFP NO.: 2-133 <br />OWCALL ENGINEERING DrSIGN SERVICES FOR'PFAS TREAI'h FNt SYSTFNIS <br />level package for the project in which the Consultant pr ilAdes a refined project budget. cov <br />estimate and proje0 schodulo that the City can corrurmit to. farad acquisitions, fatal fl€vvs„ <br />and the linkt:lized design criteria shall be incofporalerl into the Final Design Report, <br />Cc '60%, VESIGN Stei fl!IIITT'AL <br />After receiving and Irwcarparatincl comments provided by the City ain the 0% Design <br />Submittal, Ilie Contractor shaft provide an updated 60% Design $ubmittral in which <br />expectations and otxjections are finalized of the project as wwell as confirmation of <br />cmnstructabflity and permit requirements, The Consultant shall also provide playas and <br />specifications as well ors on rangineerinp cost estimate. The Consultant shall' also implement <br />acceptable value engineeiringi roquirom ants (if appl1cabfe) and identify preferred equipment <br />and materials, <br />I5 90'% DESIGN SUBMITTAL <br />The Gontractor skralt provide 9% Design Plains will) the complete prefect design„ including <br />playas and speciricatio s, subject to raaviow cnmanaonts by the City and any rather potential <br />stakeholders, The 90% Design Package shell confirm than bid availability of the project, <br />possess an pntafneees cost estimate for the bid, and finalize the builalfng perm ll package <br />(when aplalcable). The Consultant shall also provide a Commissioning Plan in the 90% <br />Design SubmittaI in which the goals, systerns, and comamissionIng processes are Identified. <br />E. riNAL DE IGN (11-0% t7ESIGN SU13,MITTAL) <br />In the finar design subnaitial, this Contractor shall im-cvrporaate all comments and requests <br />made by thr fifty in previous design subniillals and small include, taut 'is not limited'' to the <br />ibtlowing: <br />Cost Estimate, 5'peclfia~atioms and Project oheduW, <br />a. Ffnal construchon schedule' and a€rtirna'te of construction duration <br />b. construction phasing plan <br />c. Final construction staging plan with access to construction staging area <br />obtained or f riat staging .area Io be obtained <br />d, Final commissbning plan. <br />e. Engineer's cast estimates for paid and backup doc.urnentation <br />f, All land permits received <br />9. Complete set of stamped peranft applicz tfon drawings and documents <br />h. Complete sot of project permit applications excluding Contractor obtained <br />permits <br />1. Complete set of technical specific4itions <br />j, Complete Ifst Of special conditions related to construction <br />11. Arch Itacturaal systom (if Appricablej <br />a. Complete set of architectural drawings. <br />City Of Santa Ano RFP 22.133 <br />Cast -call CnginearingDerigaa Services fox PFAS aY6atloT7tr9l Sy Gams <br />page, 17 <br />