My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIROMENTAL
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIROMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:54:40 AM
Creation date
5/3/2023 3:20:45 PM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIROMENTAL
Contract #
A-2023-053-03
Agency
Public Works
Council Approval Date
4/4/2023
Insurance Exp Date
5/24/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA, AN <br />RF'P NO,: 22-1 g' <br />QN-CALL, ENGINEERING DESIGN SERVICES FOR PFAS TREATh1ENT SY,`a"I`rEMS <br />1). Final acchitoclural details - coordir'rated with s1ruclural w/stom diatails <br />c. Special exnstruction details completed <br />d'. Complete ceiling plan <br />m to iariorequilpment. <br />I. Roorm finished schedule Including: <br />I. Golor "loftion <br />ii, Floor:seleelion <br />lit, tirlirall finish <br />iv, CoMing finish <br />rl, Door sehedulo w including hardware; rrrasterkey plan working with the CIty's <br />access control specialist <br />h. Aqndow schedule including hardware <br />I. r<lrchitactural accessoiles acheeful'a <br />1. Exterior finish and color schedule <br />III, Structural System <br />a:.. Complete set at Structural drawings <br />ta. Finar sIffuctural Malls coordinated with aarchitactural system details (if <br />applicable) <br />c. Petmit set of stamped stfuctural calculations <br />dl, Final foundation and fasting Mails <br />a. Final struclural details including canstnaction dotAils <br />f. .Final ,structural calculations <br />ft. Perforrnanue a.quirer vents for shoring system Identified <br />IV, Civil site Plan System <br />a. Final sstime to of till and excavation quanlith3s <br />tt, Location of new utilities finalized <br />c. Utility connections finalized <br />€l. final design of water treatment facilities <br />e. Final ch@nnelizatlen plans <br />f. Final signing plans <br />g, Finial tandar aping plans (if applicable including plant schedule) <br />h, Final Irrigal ran systom plans <br />i. Final erosion and "diment conliral plans <br />j, Final design of traffic mitigation <br />k. Parmit sat of stamped storm water man-agem ant "Icuietlons <br />I. Surface Water Pollution Prevention Plans ('WPP ) when applicable <br />V. Mechanical System. <br />a. Complete equipment Schedule <br />b. Final piping playas <br />c. Final heating, ventilation and air conditioning (MV',AC,) plans <br />d, Final plumbing plans <br />e. Final fire protection plans and porfbrnlance specifications <br />City al S2410 AM RFP 22.133 <br />On. ali Enoirwaring 1' mign Sam -es for PFAS TraaimanL Syslormi <br />Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.