My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIROMENTAL
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIROMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:54:40 AM
Creation date
5/3/2023 3:20:45 PM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIROMENTAL
Contract #
A-2023-053-03
Agency
Public Works
Council Approval Date
4/4/2023
Insurance Exp Date
5/24/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY Or ,SAINTA AINA <br />RFP NO.: 2.2-1 3 <br />ON-C.JhL.I. ENGINEERING MICN SERVICES FOR WAS TREA'lMENl SYSTEMS <br />1. Fine section views <br />g. Final plan of ma honical ro uans <br />h. Final control diagrams Including ryrnatrol point list and final sequence of <br />operation <br />1, Final building components U" valve rairulatdans <br />j. Final mechanical details <br />ld. Final energy code calculatiora;s <br />V1, Electrical System <br />a. tightirldg and receptacles circultod' <br />ta. Special electrical €uqulpnaent circuild:d <br />o. Final panel schadulos —showing balanced dreads <br />d. Final arr: flash analysis <br />e. Final eaalecitioal fixture schd duly <br />f, Cornplole one-11ne diagrams vuhich: are directly appticatale io tide I>Mnel <br />schedule <br />g, Final' alectrical datailq <br />h. Final electrical load, calculations in:clvding emergency generator system <br />Vll.Instrumentation andl ontrol System <br />au. IFiraal Conntrerl sch�ernatirs <br />ta. Final security and a,Woss control plaints <br />c. Final location of alarm devices determined <br />d. Final Pt C/DC wwfring diagram. <br />e. A.CIDC power distribution wiring diagrams <br />3.. DICt P465E <br />Upon coralptoliibn and approval of the 1 00% design phase, the City shall request the Consultant <br />to assist ~villa th,e bidding phase. <br />A, PROJECT MANAGEMENT <br />The Consultant shall coordinate and expedite the preparation, assembly and deltwer y of bide <br />documents for the City to administer via PlanetBids, Portal_ The Consultant shall take the <br />nis. slaty procedures to administer any prequaalifleaation of potential Gonstrrtclion <br />Contractors as directed by the City to ensure: that all Contracts are cornpalitively hid. <br />frliii��Tdf11 R�7'f>�. <br />The Consultant 'shall provide technical support to the City On questions regarding tine <br />moaining and Intent of the dravrtndgs and specifications, and shall assist in achieving the <br />resolution in clarifying any comments potential Conslrtrd ion Conlractors may have during <br />the piddling phase, <br />City of SmAp Ajn{i RFP 22�133 <br />On -Call Engineering Design Services ter pFAs. Trealrinraant Sygk3nis <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.