My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EEC ENVIROMENTAL
Clerk
>
Contracts / Agreements
>
E
>
EEC ENVIROMENTAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:54:40 AM
Creation date
5/3/2023 3:20:45 PM
Metadata
Fields
Template:
Contracts
Company Name
EEC ENVIROMENTAL
Contract #
A-2023-053-03
Agency
Public Works
Council Approval Date
4/4/2023
Insurance Exp Date
5/24/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Lead, Industrial Wastewater Pretreatment Audits I Multiple Clients I Nationwide <br />• Conducted multiple industrial wastewater pretreatment audits for industries involving categorical industrial user permit <br />compliance, slug discharge control plans, discharge monitoring, enforcement response, and program reporting. <br />Project Manager / Principal -In -Charge Various Commercial and Industrial Wastewater Treatment Projects I California <br />• Routinely hired by commercial and industrial clients to assess, design, and develop effective, economical solutions for <br />wastewater treatment systems. <br />• Projects include enhancements to aeration system to increase efficiency, digester systems to reduce sludge disposal costs, <br />and lift stations and interceptors to address odors/corrosion. <br />Project Manager, Hydrogen Sulfide Characterization for Various Municipalities I California <br />• Managed development and implementation of comprehensive hydrogen sulfide source investigations, requiring vapor <br />phase monitoring and aqueous phase analysis in public sewer collection systems. <br />Aqueous phase sample collection, field preparation, field analysis, and split sampling for laboratory analysis. <br />• Performance evaluation of hydrogen sulfide mitigation measures, including chemical/biological additives. <br />Principal -In -Charge / Project Manager, Hydrogen Sulfide Mitigation I Confidential Retail Property Developer I CA <br />• Development and implementation of comprehensive sulfide management plan for retail property with 50+ food facilities <br />and 30+gravity grease interceptors to mitigate sewer odor and infrastructure corrosion issues. <br />• Vapor phase monitoring and aqueous phase analysis in private sewer collection system. <br />• Performance evaluation of mitigation measures, including aeration approaches and additives/dosing methodologies. <br />• Served as liaison for all communication with regulatory authority and Client. <br />Principal -In -Charge / Project Manager, Retail Food Service Establishment Inspection Management Services I Various <br />Municipal Clients I Southern CA <br />• Managed FOG control food service establishment inspection programs for five cities and sewer districts. <br />• Under his direction, 16,000+ inspections have been performed to date and 5,000+ notices of noncompliance or notices of <br />violation have been issued. <br />• Managed issuance of all compliance enforcement measures and tracking of implemented corrective actions. <br />Project Manager / Subject Matter Expert, SSO Consent Decree Support I Confidential Client I California <br />• Managed all technical support activities related to an SSO consent decree response for a California sewer agency. <br />• Work involved detailed assessment of SSO-related programs, recommendation of program enhancements, development <br />and negotiation with the environmentalist group on behalf of the client for reasonable performance measures, and <br />development and implementation of critical program upgrades. <br />Project Manager, Sanitary Sewer Overflow Study I OCSD and County of Orange I California <br />• Conducted research study for OCSD and County of Orange on the causes of and solutions to sanitary sewer overflows. <br />• The study was commissioned in response to increasing beach closures in Orange County due to sewer blockages. <br />• Evaluated the causes of grease blockages linked to wastewater discharge from restaurants and residences. <br />Project Engineer, Sewer System Characterization I Orange County, CA <br />• Conducted sewer system characterization projects for local cities and wastewater agencies. <br />• Performed CCTV inspections, sewer mapping using geographic information systems, and identification of structural and <br />sewer blockage issues. <br />Project Manager, Water Supply Assessment, Development, and Implementation I Confidential Client I California <br />• Served as project manager for a water supply feasibility study for a community that was not currently served by a <br />municipal supply. <br />• The project resulted in development and implementation of a viable solution to serve the short-term water supply needs <br />of the rural community. <br />Project Manager, Stormwater Management Services I Airgas Products I El Segundo, CA <br />• Managed the development and implementation of a stormwater pollution prevention plan and monitoring and reporting <br />program for the Airgas facility in Torrance, California. <br />
The URL can be used to link to this page
Your browser does not support the video tag.