My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-05-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Agenda Packet_2023-05-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2023 5:52:07 PM
Creation date
5/10/2023 10:41:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/16/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.4 Regulatory Permitting: <br />Regulatory permitting applications will be prepared as necessary to support the task orders, including, but <br />not limited to: <br />>) United States Army Corps of Engineers (USACE) Section 404 Permit for the Clean Water Act (CWA) <br />>) Regional Water Quality Control Board (RWQCB) Section 401 Water Quality Certification <br />>) California Fish and Game Code Section 1602 Streambed Alteration Notification <br />TASK 3 DELIVERABLES: <br />)> CEQA Environmental Documentation <br />>> N EPA Environmental Documentation (if needed) <br />>> Draft & Final Technical Studies/Memorandums <br />>> Regulatory Permitting <br />TASK 4 - DESIGN SERVICES <br />4.1 Project Plans <br />Mark Thomas will prepare plan submittals at the 35% conceptual level, 65%, 95%, and 100% completion <br />levels. Consultant submittals to City and other applicable agencies or stakeholders shall be complete <br />and shall include all necessary plans, special provisions, estimates, reports, and documents for PS&E <br />approval. <br />Mark Thomas will track and respond to each plan check comment in a matrix to minimize the number <br />of plan check cycles required to achieve approved plans. Plans will be prepared in Microstation and <br />submittals will be made electronically in PDF format. A listing of plans that may be required include: <br />>> Title/General Notes Sheets <br />>> Construction Details <br />>> Typical Cross Sections <br />>> Plan and Profile <br />>> Grading Plans <br />>> Utility Composite Plans and Details <br />>> Drainage Plan, Profiles and Details <br />>> Construction Staging/Traffic Handling <br />>> Sign and Striping Plans <br />>> Traffic Signal/ITS Plans <br />>> Street Light Plans <br />>> Retaining Wall Plans <br />>> Structure Plans <br />>> Landscape and Irrigations Plans <br />4.2 Special Provisions <br />Develop technical specifications as Special Provisions in conformance with American Public Works <br />Association (APWA) Green Book format, including necessary Caltrans standards and specifications, and <br />provide copies of required permits and reference standard plans/materials to be inserted into the City's <br />contract bid documents. <br />MARKT---' e 011-cAttE - —m-M-3SERVICES <br />Page A-1"dMcouncil 20-281 Santa Ana <br />2 y <br />
The URL can be used to link to this page
Your browser does not support the video tag.