Laserfiche WebLink
Photographs of Existing Facade* muacnmi <br />Submit several photos of your building in its current condition. If necessary, also take several photos of buildings in the <br />area to demonstrate that your proposed improvements will maintain the character of the area. Be sure to label each <br />photo and indicate what improvements you are proposing to make in each image. <br />Electric box completed fence.JPG <br />63.29KB <br />Electric box and Dumpster before fencing.JPG <br />109.48KB <br />Metal fencing around top of dumpster gate completed,jpg <br />2.94MB <br />Hallway Powerwash.jpg <br />2.97MB <br />Parking Lot Graffiti Powerwash.jpg <br />3A8MB <br />Store Side Repaint.jpg <br />2.75MB <br />Birds in Shingles Remove and Prevent.jpg <br />1.8MB <br />Back of Building Repaint.jpg <br />2.28MB <br />Peeling Paint Back of Building Repaint.jpg <br />2.32MB <br />Store side Graffiti and Landscaping Remove and Install Plants_Drip <br />2.5M6 <br />system —Ground Cover.jpg <br />Store Side Landscaping Remove Lawn —New Plants_Drip <br />2.92M8 <br />system —Ground Cover.jpg <br />Parking Lot Powerwash.jpg <br />2.26MB <br />Front Entrance Landscaping Artificial turf.jpg <br />2.77MB <br />Store Front I.andscaping_automatic drip Irrigation install —drought <br />3.6MB <br />tolerant plants and boulders.jpg <br />Store Front Window uncover 75 percent.jpg <br />1.72MB <br />Front Landscaping_artificial turf install.jpg <br />4.29MB <br />Sign Board 1_Install brand new.jpg <br />3.28MB <br />Sign Board 2—install brand new.jpg <br />2.84MB <br />Front Landscaping 2 Artificial turf install.jpg <br />3.38MB <br />Front Landscaping 3 Drought tolerant plants and boulders —install <br />3.54M6 <br />automatic drop irrigation.jpg <br />Building Facade Repaint —remove bird nesting and prevent.jpg <br />2.36MB <br />Graffiti on Unit Window Remove and powerwash.jpg <br />2.48MB <br />Drawings of Proposed Improvements* <br />Include a concept drawing of what the site will look like after work is completed. For larger projects involving a major <br />scope of work this will include copies of your renovation plan containing elevations and site plans. For smaller projects, a <br />simple sketch may be appropriate at the City's discretion. In addition to a conceptual drawing include product sample <br />sheets of design elements such as windows, doors, lighting, canopies, etc, showing colors, size, type of material, etc. <br />Landscape sketch on side of 98 cents store.jpg 1.07MB <br />Additional Project Documents <br />Project Start Date* Project End Date* <br />09/19/2022 10/31 /2022 <br />Additional Comments* <br />Our timeline is highly dependent upon each contractor's availability and scheduling. For example, the contractor for <br />signage has indicated that due to the complete rebuild of the sign board monument, the job will take 4-6 weeks for the <br />materials and then a 1 day installation once it is ready. Landscaping around the sign board must also be delayed until <br />sign board is completed in order to ensure quality is protected. <br />