Laserfiche WebLink
On -Call Engineering Services RFP No. 23-030OF <br />ro7 <br />along the design street approaches. We will provide a Queueing Summary Memorandum to document <br />the results. <br />Task 13 — Signing and Striping Plans <br />Kimley-Horn will prepare signing and striping plans within project limits. The signing and striping plan will <br />be prepared with current City of Santa Ana and Caltrans standards, and will be prepared at scale of V _ <br />40' using MicroStation V8i version drafting software on a 24" x 36", full-size sheet. <br />Task 14 — Traffic Signal Modification Plans <br />Kimley-Horn will prepare a traffic signal modification plan at the project intersection. Plans at a minimum <br />will show pole schedule, conductor schedule, phase diagram, pole location detail, general notes, and <br />construction notes. The traffic signal modification plan will be prepared in accordance with current City of <br />Santa Ana and Caltrans standards and will be prepared at a scale of 1" = 20' on a 24" x 36", full- size <br />sheet using MicroStation V8i version drafting software. <br />Task 15 — Street Light and Electrical Plans <br />Kimley-Horn will prepare street light plans within project limits. We will conduct voltage drop calculations <br />to determine the wiring sizes. We anticipate we will need to connect to existing service locations along <br />the corridor. New service point locations may be necessary. Coordination with Southern California <br />Edison to determine new and existing service points to be used will be a part of this task. We will provide <br />a photometric analysis to determine required illumination for the corridor. The street light plans will be <br />prepared on at a scale of 1" = 20' horizontal on 24" x 36" full-size sheets. Decorative street lighting <br />fixtures are excluded from this scope of services. <br />Task 16 — Landscape and Irrigation Plans <br />The Kimley-Horn team will prepare landscape and irrigation plans for the proposed medians, parkways, <br />and open spaces within the project limits. These plans will be consistent with the City's Standards and <br />General Plan; the City's Scenic Corridor Elements; the City's Urban Design Elements; and California's <br />Water Efficient Landscape Ordinance. The plans will consider City maintenance when developing the <br />design. We also will provide landscape design for private property landscaped areas impacted by street <br />improvements. Landscape and irrigation plans will be prepared at a scale of 1" = 20' horizontal. <br />Task 17 — Opinion of Probable Construction Cost <br />Kimley-Horn will prepare an opinion of probable construction cost, using Microsoft Excel, for verification <br />of project budget and assistance during the contractor's bidding process. Measurement of units will be <br />contained in the specifications with additional detail for lump sum items as necessary. Unit prices will be <br />derived from current bid information on similar work within the area. Backup information will be submitted <br />along with the estimate if requested for City record and concurrence. <br />Kimley>»Horn <br />