expectations. We will confirm our understanding in our negotiated scope and verify that we are on track by conducting design <br />review meetings on a regular basis from planning through final design. <br />» We will meet with sub -consultants to ensure their scope is complete. <br />» We will design the project in accordance with your schedule. This begins with development of a detailed schedule that includes <br />critical path, agency review times, and milestones. Progress will be reviewed during our design meetings. <br />» We will design a project that is within your budget. We will develop a project budget that includes contingency, probable construction <br />cost, and consultant fees. The probable construction cost will be prepared using current unit prices and submitted for review. <br />» We strive to minimize non -client initiated change orders during construction. Our QA/QC procedure implements a constructability <br />reviewer. It helps us foresee and resolve potential issues before the bidding phase. <br />Our PM will establish the framework and ensure that we capture your expectations for quality prior to publishing our plan. <br />Existing Utility Inventory - Every project presents its own special design challenges. The most frequent chi lieige related to existing <br />utilities we would expect in the City of Santa Ana. Is that improvement to utilities located in developed areas will generally affect or <br />be affected by other utilities. Through experience we have learned that existing records may be non-existent, inaccurate, or lack <br />information. This is why all projects require an effective existing utility locating approach. A precise utility inventory will: <br />» Equal a high quality design <br />» Avoid conflicts during construction <br />» Prevent utility interruptions <br />» Promote public safety <br />» Avoid construction change orders <br />» Prevent construction delays <br />With HZ, utilities will be located, verified, and compiled into a V8i CADD file using a "Four Tier Approach." <br />TIER I: SITE INVESTIGATION - Huitt-Zollars conducts a cursory site investigation that includes pictures used to formulate the <br />scope of services. The information gather identifies utility purveyors in the project vicinity and assesses probable challenges. <br />TIER II: GATHER RECORD DATA - Huitt-Zollars request records from utility purveyors in the project vicinity. The City of Santa <br />Ana will provide information in its possession relevant to the preparation of the project plans. Record information will be reviewed and <br />compiled into a V8i CADD file. The information is further verified during the topographic survey. <br />TIER III: TOPOGRAPHY SURVEY — One week prior to surveying, HZ will contact Dig -Alert USA with a project exhibit to request <br />that existing utilities be marked within the project limits. Our survey department will capture utility markings, visible surface utility <br />features, and dip manholes as necessary. The survey shots will be compiled with the record data and used to verify utility locations, <br />inverts, size, and flow direction. The information will help our civil team foresee potential challenges during design. <br />TIER IV: SUB -SURFACE INVESTIGATION - The data collected in previous tiers is used to arrive at possible utility conflicts <br />during preliminary design. Our goal is to resolve each conflict via good research and design, But we must also prepare with a set aside <br />budget for further sub -surface investigation shall it be necessary. A task sets aside a budget for potholing cost and incidentals. The <br />investigation is kicked off after preliminary design so that the findings help improve the level of quality of future submittals. <br />Environmental Assessment — Verify that the work limits are within areas with existing infrastructure. Small improvements of this <br />nature typically qualify for environmental exclusions but if the work requires a negative declaration. Our first step would be to research <br />existing environmental filing(s). There after our consultant and civil team would assist the City of Santa Ana with supporting studies and <br />documentation to comply with CEQA and/or NEPA. <br />Topography - HZ is leading the industry with fixed wing aerial drone surveying. The new technology has a perfect platform in topography. <br />With on board RTK the data will generate an accuracy that matches conventional aerial photography but a picture quality that is unmatched. <br />It allows for quicker delivery and data control at a competitive fee. The data would be supplemented with a field survey(s) and tied to <br />the most appropriate datum. HZ will acquire necessary permits to perform aerial surveys via drones. Our survey department would also <br />provide legal descriptions, if required. Providing plans, specifications, and estimates (PS&E) for engineering projects is the backbone of <br />our Irvine branch. We are familiar with local, state, and federal codes and regulations. This ensures that the design is in conformance <br />with established guidelines. We are also experience with preparation of special provisions. We have been serving Southern California <br />for over 30 years this includes projects with the City of Santa Ana. We are familiar with the City's criteria for acceptance of plans. <br />City of Santa Ana Civil Engineering Services: RFP 23-030 <br />7 <br />