Laserfiche WebLink
As part of a five year On -Call Services with the City of Santa Ana Water <br />Resource Department. Huitt-Zollars is providing Plans, Specifications <br />and Estimates (PS&E) for several projects in the City of Santa Ana. <br />The Sanitary Sewer Septic to Gravity Conversion Project proposes <br />to construct 8" sewer in a neighborhood near 17th Avenue and Tustin <br />Avenue. Huitt-Zollars in providing CEQA documentation and PS&E <br />for over 2500 linear feet of proposed 8" sewer, service laterals, and <br />manholes. <br />2. Lacy Neighborhood Water Replacement Project proposes to replace <br />over 15,000 linear feet of water line and services. The project is part of <br />a citywide program that proposes to replace and increase capacity of <br />over 30,000 If of water line per year. Huitt-Zollars is preparing PS&E <br />that include topography and temporary high water lines. <br />3. French Park Water Replacement Project proposes to replace over <br />15,000 linear feet of water line and services. The project is part of a <br />citywide program that proposes to replace and increase capacity of <br />over 30,000 If of water line per year. Huitt-Zollars is preparing PS&E <br />that include topography and temporary high water lines. <br />COMPONENTS: <br />PS&E <br />Paving <br />Domestic Water Improvements <br />Sewer Improvements <br />Environmental <br />CLIENT CONTACT: <br />City of Santa Ana <br />Armando Fernandez <br />Senior Civil Engineer <br />Public Works I Water Resources <br />aeernandez@santa•ana.org <br />20 Civic Center Plaza, M-35 <br />Santa Ana, CA 92802 <br />714,647.3316 <br />Huitt-Zollars prepared the design of approximately 6,000 of 12" HDPE highline for recycled water to assist the <br />Water district in the transportation of recycled water through the Santa Margarita Water District. Huiit-Zollars also <br />assisted the Santa Margarita Water district in the design and construction of a booster pump station to boost the <br />pressure of the recycled water line through multiple pressure zones. <br />Additionally, Huitt-Zollars worked with Santa Margarita Water District to prepare multiple details to switch pipe <br />materials and underground the highline into a casing and create a crossing of a secondary arterial highway. The <br />design was completed to allow for the maintenance of the pipe without disrupting traffic on the highway. <br />RELEVANT DESIGN COMPONENTS: <br />Survey <br />Engineering Estimates <br />Water Improvements <br />CLIENT CONTACT: <br />Santa Margarita Water District <br />Jamie Aguilar <br />jaimea@smwd.com <br />26111 Antonio Parkway <br />Rancho Santa Margarita, CA92688 <br />949.459.6400 <br />City of Santa Ana Civil Engineering Services: RFP 23-030 <br />10 <br />