Laserfiche WebLink
PROJECT EXPERIENCE <br />Mark Thomas has significant experience providing on -call services for local agencies, including well over <br />50 agencies in California. Locally, these include the cities of Yorba Linda, Anaheim, Fullerton, La Mirada, <br />Montebello, Irvine, Pomona, Rialto, Banning and the counties of Orange, Riverside and San Bernardino. <br />We understand the importance of being flexible and responsive when meeting project needs. We <br />consider ourselves experts in providing task order driven services with limited budgets and reduced <br />schedules. Over the years we have found that the cornerstone of a successful project is for us to operate <br />as an extension of City staff. Our longevity and local experience serve as clear evidence that we know <br />how to manage and deliver projects. Following are a sampling of our relevant projects that demonstrate <br />our ability to deliver a wide range of services. <br />CITY OF SANTA ANA <br />Mark Thomas is currently providing the City of Santa Ana with on -call <br />engineering services as well as separate contracts for additional services. <br />A sampling of our work includes: <br />Santa Ana Grade Boulevard Separation: Provided value engineering <br />services to develop an alternative solution to reduce right-of-way impacts <br />and project costs. Prepared funding strategies and State and Federal <br />funding grant applications for TIRCP and RAISE, respectively. <br />Santa Ana Stadium Structural Repairs: Prepared a memorandum <br />documenting the site investigation, analysis and recommendations for the <br />structural repairs at the stadium. Provided final design services and PS&E <br />for the project. <br />Standard Avenue Bike Lanes: This Bikeway Project was developed <br />collaboratively with the community and formalized in the Central Santa <br />Ana Complete Streets Plan. It addresses multimodal mobility needs <br />with high -quality public space improvement. Mark Thomas is leading <br />the preparation of engineering design plans (PS&E) to right -size and <br />reconfigure two miles of Standard Avenue from Warner Avenue to <br />First Street. The project includes buffered bicycle lanes, separated <br />bikeways, and shared use bicycle routes as well as green conflict striping, <br />crosswalks, and landscaping. The project will include the first protected <br />intersection design within the City at Standard Avenue/McFadden Avenue <br />and continue to anchor Santa Ana as a community that delivers mobility <br />solutions for the residents. <br />Warner Avenue Improvement & Widening Phase I: Provided design <br />services for the widening of Warner Avenue, from Main Street to Oak <br />Street. The project will widen the roadway from a four -lane undivided <br />arterial to a six -lane divided arterial to conform to the City and County <br />Arterials Master Plan. Project includes improvements to the Main <br />Street intersection and five residential streets. The project also includes <br />landscape improvements and permanent water quality improvement <br />features within the parkway areas. Design includes a curb separated <br />Class IV protected bike lane that will connect to the regional Pacific <br />Electric Bicycle Trail Class I. <br />ON -CALL ENGINEERING SERVICES MARK THOMAS <br />City of Santa Ana Page 15 <br />