My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSOMAS (6)
Clerk
>
Contracts / Agreements
>
P
>
PSOMAS (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:05:59 PM
Creation date
6/26/2023 3:55:45 PM
Metadata
Fields
Template:
Contracts
Company Name
PSOMAS
Contract #
A-2023-088-06
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/2/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Scope of Services <br />The tables below illustrate the typical detailed tasks and deliverables. <br />Preliminary Design <br />Attend kick-off meeting at City to discuss scope, schedule, and lines and <br />methods of communication between Psomas team and City staff. <br />Verify pipe information from "as-builts." .nnfirmed by cleaning and CCTV. <br />Develop/confirm existing and build -out flow using tributary area, land use <br />and flow factors. Model system to confirm flows and d/D for each reach. <br />Perform utility research by contacting all potential utility companies and <br />conducting field walk. <br />Develop/confirm required pipe sizing using build -out flow and City <br />capacity criteria. <br />Provide survey services as required. <br />Conduct up to two (2) 15-foot-deep borings. <br />Prepare draft PDR, meet with City staff to review comments, and finalize <br />PDR. <br />Deliverables: Utility research correspondence and plans gathered to date, CCTV <br />logs and video file, geotechnical report (all on digital media), draft and final PDR, <br />meeting agenda and minutes. <br />50% Design <br />Based on preliminary alignment, perform up to five (5) potholes to verify <br />existing utility depths. <br />Prepare 50% PSBE submittal. <br />Deliverables: Final utility research correspondence and plans and <br />50% PSBE submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.