My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWE (3)
Clerk
>
Contracts / Agreements
>
C
>
CWE (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:07:13 PM
Creation date
6/26/2023 3:58:23 PM
Metadata
Fields
Template:
Contracts
Company Name
CWE
Contract #
A-2023-088-08
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
12/8/2023
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />On -Call Engineering Services (RFP No. 23-030) <br />Landscape Architecture and Site Design <br />Landscape and Irrigation Plans <br />Landscaping and irrigation plans will be prepared by our team, if necessary. Landscaping and <br />irrigation plans include plant palettes, tree species, hardscape, locations of irrigation control <br />valves, identification of water sources, and other important features of park and parkway design. <br />Park Design <br />We understand the importance of parks4c the City, and we have worked on several projects <br />involving Public Works' park planning staff, including Santa Anita Park, Santa Ana Zoo, King <br />Street Pocket Park, and several others. Our team is capable of producing designs for entire city <br />and regional parks, as we have done for San Fernando Regional Park, John Anson Ford Park in <br />Bell Gardens, and East Side Regional Park in Visalia. <br />Site Design <br />Our site design approach includes the following architectural, electrical and mechanical <br />elements. The process also includes the design of instrumentation and control systems, and <br />systems for fire protection. <br />Environmental and Planning Support <br />The CWE Team is adept at preparing CEQA/NEPA documents for water, sewer, and flood <br />control infrastructure projects throughout Southern California, and have the in-house technical <br />expertise to prepare a successful environmental document for most any infrastructure project. <br />The report includes the field investigations, technical studies, and environmental documents to <br />move the project into final design. The engineering studies conducted at this phase typically <br />include: traffic engineering and modeling, preliminary structural, roadway geometric, <br />stormwater, preliminary geotechnical, utilities and right-of-way. Tasks will include regulatory <br />compliance with federal, state, and local agencies. <br />Grant Writing Services <br />Once a grant opportunity is identified and the City has approved us to move forward in pursuing <br />the funding opportunity, CWE will review the application requirements and prepare a list of items <br />needed (plans, concept reports, cost opinions, etc.) from the City project participants to <br />complete the application package. The following steps are anticipated once a project and grant <br />program have been agreed upon with the City. <br />➢ CWE reviews application/program guidelines, attends overview webinar or seminars <br />when applicable, and requests needed information from the City <br />➢ Prepare grant development schedule (identifying deliverable dates, review timelines, and <br />grant deadlines) <br />➢ Kick-off conference call with City to discuss data needs and City perspective on the <br />project <br />➢ Coordinate with stakeholders to collect pertinent information and/or letters in support of <br />the project <br />GE_19- <br />
The URL can be used to link to this page
Your browser does not support the video tag.