My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLEINFELDER, INC. (3)
Clerk
>
Contracts / Agreements
>
K
>
KLEINFELDER, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:17:54 PM
Creation date
6/26/2023 4:07:49 PM
Metadata
Fields
Template:
Contracts
Company Name
KLEINFELDER, INC.
Contract #
A-2023-088-11
Agency
Public Works
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
4/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
between approximately 60 feet and 110 feet. All six bridges are single -span prefabricated steel truss bridges, <br />bearing upon cast -in -place concrete abutments. The designs of the superstructures of the prefabricated trusses <br />were prepared and submitted by the contractor during the construction phase. Kleinfelder provided the abutment <br />designs and specifications for contractor superstructure designs. <br />Chinquapin Sewer Lift Station — Metal Roof Canopy Design: Kleinfelder provided the structural design of a <br />steel frame canopy supporting a standing seam metal roof, which was placed on an existing masonry enclosure. <br />The canopy has a sloping roof with height that varies from 6 inches to 2.5 feet above the existing masonry wall. <br />The supports for the canopy were bolted to the masonry wall with post -installed anchors. The roof framing was <br />designed in accordance with the 2010 California Building Code. Kleinfelder provided structural plans and <br />calculations, and a site visit prior to start of design to observe the existing structure and take photos and <br />Pipeline8 Irvine Lake .. Hills Zone C+ Reservoir I Irvine, CA <br />Reference: Irvine Ranch Water District, Jacob Moeder, Project Manager, 949-453-5554, moeder irwd.com <br />Project Duration I Contract Value: 2014-2016 1 $934K <br />Key Staff: Eric Ng, Christina Nishimoto, Art Garcia, Jason Brown <br />Kleinfelder provided expert project management, structural engineering, Civil Site <br />design, and geotechnical engineering for the design of the 2.4-MG recycled water <br />reservoir. Kleinfelder's responsibilities included oversight and site layout design, <br />reservoir design, appurtenance design such as strainers, backwash system, valve, <br />and vault, overflow system, stormwater drainage system, and pipelines. The <br />reservoir is partially buried, and the overall site layout required the design of <br />concrete block retaining walls. Mechanical elements at the reservoir site included <br />flow metering equipment, strainers to remove shells and other debris from the untreated water entering the <br />reservoir from Irvine Lake. <br />As part of the geotechnical study, Kleinfelder evaluated four reservoir sitting alternatives. A detailed geotechnical <br />investigation was required to identify historical landslides and abrupt changes in geological formations beneath <br />the site to optimize the reservoir location. <br />As part of the civil site design, Kleinfelder developed the site layout plans including temporary excavation and <br />access road plans, final grading and access road designs, retaining wall layouts, and the site stormwater <br />conveyance system. <br />REFERENCES <br />Kleinfelder has several recent, relevant, public entity references where the team has performed <br />similar work within the past five years. Below are three references with valid, current emails. We <br />encourage the City to reach out to these agencies and learn more about Kleinfelder's successful <br />project delivery. <br />Javier Soto, PE, PMP, QSD Manager <br />Project • e of Work <br />On -Call Construction Inspection, Geotechnical, <br />J. <br />Orange County Public Works <br />Construction Materials Testing and Inspection <br />OC Construction/Special Projects County of Orange <br />Project Description 05 <br />714-227-1470; Javier.Soto@ocpw.ocgov.com <br />2 <br />Edson Bandoy, Assoc. Civil Engineer <br />City of San Diego As -Needed Engineering Services, three <br />City of San Diego <br />as -needed 5-year contracts <br />858-292-6458; ebandoy@sandiego.gov <br />Project Description #1 <br />3 <br />Dan Beers, Principal Project Manager <br />City of Ontario/Ontario Municipal Utilities Company, <br />City of Ontario/ Ontario Municipal Utilities District <br />various On -Calls including As -Needed Professional <br />909-395-2806 1 C: 818-388-0212 <br />Engineering Design Services, As -Needed Geotechnical <br />dbeers@ontarioca.gov <br />and Materials Testing Services <br />Project Description #4 <br />�E/NFELOER City of Santa Ana On -Call Professional Engineering Services — No. 23-030 1 Page 20 <br />&19N�<le P9h1 WN,mn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.