My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP, INC. (6)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:18:27 PM
Creation date
6/26/2023 4:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP, INC.
Contract #
A-2023-088-12
Agency
Parks, Recreation, & Community Services
Council Approval Date
5/16/2023
Expiration Date
5/15/2026
Insurance Exp Date
5/1/2024
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I On -Call Engineering Services <br />i _ RFP NO.: 23-030 <br />PROJECT CONTROLS <br />IDS provides skills and decision -making capabilities honed from many years of experience serving <br />our clients. The overarching goal will be to ensure that project work is performed in strict accordance <br />with contract documents, the project's schedule and budget, and governmental requirements. These <br />services will primarily fall within the following four functional categories: <br />• Cost Management: Provide accounting guidelines and budgets, establish cost control mechanisms, <br />provide forecasts, validate project estimates, develop estimates, and negotiate change orders, <br />anai.Vao cash flow, generate change order contingency reports, and develop estimates for <br />alternative strategies for cost reduction scenarios. <br />• Time Management: Ensure timely decision -making and actions regarding RFIs, submittals, <br />schedule development, schedule review, monitoring of schedule resources and analysis of time <br />extension requests. <br />• Quality Management: Provide quality assurance and control functions necessary for constructability <br />review and inspection. Enforce codes, regulations, design criteria, and safety requirements; and <br />• Project/Contract Administration: Ensure that all the administrative tasks that must take place during <br />project execution are accounted for. <br />PROJECT BUDGET & COST CONTROL <br />IDS believes that a comprehensive project budget should addresses all phases of the project and <br />that a Cost Account Structure will be established so that costs are distinguishable at all levels of <br />management. This budget will track costs performed from design through construction and actual costs <br />invoiced through progress payments. The budget will be further refined as design activities continuous <br />throughout the project and cost data becomes available. This process provides the City the ability to <br />verify adherence to the project budget and scope of work. <br />PROJECT REPORTING PROCEDURES <br />IDS will provide reports that compare budget to actual costs, <br />analyze cash flow and identify trends, present budget and schedule <br />forecasts to the identified milestones. The reporting systems will <br />include summaries and graphics. Reports will be designed to <br />provide information at the different levels of detail required by the <br />City's staff, or other project participants and decision -makers. <br />Our proficiency with the industry's scheduling tools, such as <br />PlanSwift® and Microsoft Project, enable us to control any project's <br />time functions. Moreover, IDS has successfully used cost control <br />systems on numerous projects. We have identified, captured, <br />reported, and controlled costs using PlanSwift® and other client - <br />required systems. The project controls systems can be set up on <br />a facility -commodity basis such that roll -up reports can be created <br />giving visibility to individual facility or individual commodity status. <br />A IDS GROUP Page 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.