My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Santa Ana Zoo Educational Hub Building Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/01/2023 Regular and HA
>
Item 15 - Santa Ana Zoo Educational Hub Building Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:04:43 PM
Creation date
8/9/2023 3:28:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/1/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Structural Design and Detailing <br />Mechanical Engineering & Plumbing <br />Electrical Engineering <br />o Electrical Site Plan to include walkway lighting, irrigation. <br />o Location of panels, switchgear, meters <br />o Schedules <br />o Details <br />o Notes, specifications <br />Plan Check & Permits. - <br />Construction drawings shall be in accordance with the 2013 California Building Code and will require <br />review/approval by the City Planning and Building Agency. <br />As a condition of plan check approval, plans, specifications and structural calculations must be signed <br />by a California licensed architect / landscape architect /civil engineer/structural engineer as <br />appropriate. Plans shall be organized so that they can be segregated cleanly for distribution to the <br />various plan checking entities. <br />Construction drawings shall be submitted at 90% completion for review by Public Works Design <br />Engineering and Santa Ana Zoo staff and revised per their comments. The 100% complete <br />construction drawing package will then be submitted for fmaI City review to the following City <br />Agencies: <br />Parks, Recreation and Community Services Agency/Santa Ana Zoo <br />Planning and Building Agency <br />Public Works Agency Design and Construction Engineering Divisions <br />The Public Works Agency Project Manager will coordinate the submittal and review process. Once <br />complete, the consultant will revise the Contract Documents <br />Technical Specifications <br />Technical specifications for all components listed above shall be provided by Consultant, or their <br />Sub -consultants, to the City in CSI (Construction Specifications Institute) format. City Staff will <br />combine these specifications with the City Boiler Plate which together, will become the Project <br />Manual. <br />Final Opinion of Probable Cost <br />Consultant shall provide updated opinion of probable construction cost which shall reflect finalized <br />plans, materials, systems, details of construction, and known or anticipated changes in the bidding <br />market relative to the project. Should project scope exceed available budget, project <br />plans/specifications will be phased as appropriate. <br />Task 5: Bid Advertisement, Construction Administration, Record Drawings: <br />Bid Advertisement <br />City of Santa Ana RFP 23-033 <br />Page Al-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.