My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Santa Clara Avenue Bike Lane and Pedestrian Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
11/15/2022 Regular & Special HA
>
Item 12 - Santa Clara Avenue Bike Lane and Pedestrian Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 4:46:01 PM
Creation date
8/14/2023 8:49:37 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
11/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Clara Avenue Bike Lane and Pedestrian Improvements From Lincoln Avenue to <br />Pasadena Street <br />November 15, 2022 <br />Page 2 <br />contract administration, inspection and testing, and $340,000 project contingency for <br />unanticipated or unforeseen work. <br />5. Approve an amendment to the Fiscal Year 2022-23 Capital Improvement Program to <br />include $581,000 in construction funding from the Measure M2 Local Fairshare <br />funds, and $3,243,000 in construction funding from Senate Bill 1, SCCP grant funds <br />for the Santa Clara Avenue Bike Lane and Pedestrian Improvements from Lincoln <br />Avenue to Pasadena Street. <br />DISCUSSION <br />Currently, a portion of this segment of roadway on Santa Clara Avenue between Lincoln <br />Avenue and Pasadena streets (Exhibit 1) has no sidewalk, bikeway, or pedestrian <br />crossings. The lack of cyclist and pedestrian facilities encourages unsafe practices by <br />requiring users to walk or bike along an uneven and narrow dirt path, or on the street <br />with vehicular traffic where visibility may be limited by parking lanes. Improvements <br />along this segment include adding Class II buffered bike lanes, addressing drainage <br />issues, and installing a new sidewalk and intersection for pedestrian crossing, signing, <br />and striping. <br />Once complete, the newly constructed bike lane and sidewalk will enhance bicyclist and <br />pedestrian safety, provide access and connections to schools, parks, commercial <br />centers, and residential centers, and encourage more walking and cycling by the <br />community. <br />Public Outreach and Contractor Participation <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on August 22 and August 29, of 2022. The project was also advertised in <br />PlanetBids from August 22, 2022 through September 13, 2022. Bids were received <br />electronically via PlanetBids on September 13, 2022. <br />To provide an opportunity for local vendors to submit bids, the City notified a total of <br />63 regional vendors via PlanetBids, many of which are Santa Ana based. A total of five <br />bids were received; however, no bids were received from any Santa Ana contractors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.