My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 21 - Pressure Control Station Relocation and Transmission Main Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:44:00 PM
Creation date
8/15/2023 1:44:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA-2 Pressure Control Station Relocation <br />and Transmission Main Improvements <br />RFP No. 21-127 <br />Task 9: Bidding and Construction Phase Services <br />Throughout the bidding and construction phase, Tetra Tech will provide assistance to the City's Project <br />Manager and Construction Manager as requested in the RFP. <br />We have assumed that two (2) Addendum will be prepared. <br />We have assumed that the City's Construction Manager will be the primarily responsible to evaluate <br />and respond to the Contractor's requests for change orders. We have assumed that Tetra Tech will <br />support the Construction Manager as requested. For this proposal, we have assumed a maximum of <br />four (4) hours of Project Manager and eight (8) hours of Construction Support Lead for each change <br />order request that will need our attention. <br />Tetra Tech, with support from Enterprise Automation, will perform Factory and Site Acceptance Testing <br />of all control equipment. Tetra Tech will provide as -needed support to the City's contractor who will be <br />responsible for installing instrumentation, fabricating and installing control panels, installing equipment <br />and implementing network infrastructure modifications. For this proposal, we have assumed a <br />maximum of two days of the panel FAT to support the contractor and assist with executing the FAT <br />procedures. Tetra Tech will also participate in and oversee up to 2 days of the City's programmer's <br />FAT and SAT testing to ensure they are in compliance with the FAT and SAT protocols developed for <br />the project. <br />Tetra Tech will review a maximum of sixty (60) shop drawing submittals. For this proposal, we have <br />assumed that twenty (20) of the submittals will require a second review. <br />Tetra Tech will provide the following Envision related services during the construction phase: <br />Compile documentation from City's construction management staff and construction contractor to <br />validate credits requiring commitments during construction phase and to support post -construction <br />review by ISI. <br />ask 10: As -Built Preparation <br />Tetra Tech will prepare the construction drawings using the latest version of AutoCAD. As part of the <br />As -Built Preparation Task, Tetra Tech will convert all construction drawings to MicroStation v8i format <br />or compatible and submit the as-builts drawings in MicroStation format. <br />Task 11: Commissioning Bid Itet <br />Enterprise Automation will assist Tetra Tech's project team in supporting the City in the commissioning <br />of the SA-2 facility into operation. <br />Task 12: Onerations and Maintenance Manual <br />Enterprise Automation will assist Tetra Tech's project team in preparing an operational site manual that <br />fully defines how the site functions. In addition, all operator duties will be defined and procedures for <br />field checking common errors will be established. The intent of this site manual is to define standard <br />operating procedures for field operations of this facility. Tetra Tech will request an example of an <br />operational site manual for one of the City's other facilities. <br />TETRA TECH Page 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.