My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Approve Agreement for Learning Management System
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/17/2022 Special and Regular
>
Item 24 - Approve Agreement for Learning Management System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 4:45:13 PM
Creation date
8/15/2023 1:45:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
24
Date
5/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MERIDIAN Deliverables <br />• MERIDIAN Base HRIS template. <br />Backfill and delivery of the three (3) flat files <br />• Configuration of the Meridian LMS HRIS <br />to Meridian for processing: User Data, <br />Tool based upon the completed <br />Organizations, Job Titles. <br />Requirements Document specified in task <br />B.2 above. <br />• One pre -production load of a subset of <br />CLIENT production ready data for CAT <br />purposes. <br />• One production load of full user data into <br />the CLIENT production environment. <br />Assumptions <br />Acceptance Criteria <br />• One-way HRIS integration inbound to the <br />HRIS Tool configured and tested per the <br />Meridian LMS application only. <br />Requirements specified in task B.2 above, <br />• Meridian configure the HRIS and load a <br />in the Meridian LMS CLIENT Stage <br />subset of CLIENT production ready user <br />environment. <br />data in the Meridian LMS CLIENT Stage <br />One (1) final data load in Meridian LMS <br />environment for testing purposes. <br />CLIENT Production environment. <br />MERIDIAN will conduct and support five (5) <br />days of Customer Acceptance Testing for <br />all tasks defined in section B herein. <br />• Upon completion of CAT, MERIDIAN will <br />load a full set of CLIENT production data in <br />the Meridian LMS CLIENT production <br />environment. <br />5. Standard Setup Tasks: Production Installation <br />The purpose of this task is to complete the installation of the Meridian LMS base application, <br />database, configurations, branding and integrations into the Meridian LMS CLIENT production <br />environment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.