My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - On -Call Traffic Control Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/01/2022 Special and Regular & HA
>
Item 13 - On -Call Traffic Control Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:20:05 PM
Creation date
8/16/2023 12:07:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
2/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note — Contractor(s) may be required to furnish material, equipment and supplies. Work may be <br />performed after hours which may require specific equipment for night time work. <br />The Project manager or his/her(s) duly authorized representative will monitor the contractor(s) <br />operations and on periodic basis to assure compliance with proper traffic control and safety <br />procedures. <br />The selected contractor(s) must have the expertise, experience, and demonstrated resources <br />available to perform the work described in this RFP. <br />Project Management, Equipment/Supplies: <br />The contractor(s) services and materials shall be in accordance with the provisions, guidelines and <br />specifications detailed here in and not limited to the latest editions of the following: Manual on <br />Uniform Traffic Control Devices (MUTCD), Work Area Traffic Control Handbook (WATCH), <br />American Association of State Highway and Transportation Officials (AASHTO), Caltrans, the <br />Americans with Disabilities Act, the City of Santa Ana Municipal Code (SAMC), professional <br />Standards established by the City of Santa Ana standard plans section 1125F, and or federal, state <br />and local guidelines established in the project. <br />All vehicles involved in the traffic control job order shall be clearly identified, and any vehicle <br />participating in traffic control setups and takedowns must have all warning and flashing signs <br />properly and fully functional including and not limited to: warning signs, flashing lights, arrow <br />boards, and safety backup alarms. Traffic mounted attenuators will be required for traffic control <br />performed on major arterial streets. <br />The contractor(s) shall have project management control procedures in effect during the entire <br />time work is being performed under the Agreement. This task shall include the following: <br />• Project Management Plan- the consultant shall provide a detail management plan including <br />information and coordination to ensure compliance and completion of the job order tasks <br />• Quality Control/Quality Assurance (QA/QC) Plan <br />• Project Schedule/Invoicing <br />• Project Correspondence <br />In case of conflict, ambiguities, discrepancies, errors, or omissions, the contractor(s) shall submit <br />the matter to the City for clarification. <br />The following services/items shall include, but are not be limited to: <br />1. If included in the on -call project scope, attend meetings with the City staff as required. <br />2. The contractor(s) shall coordinate the work with the proper regulatory agencies and have their <br />respective representatives on site if required. <br />3. Contractor shall monitor all traffic control setups to ensure proper functioning and or to repair <br />damaged or missing traffic control. <br />City of Santa Ana RFP 21-120 <br />Page Al-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.