My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - On -Call Traffic Control Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/01/2022 Special and Regular & HA
>
Item 13 - On -Call Traffic Control Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:20:05 PM
Creation date
8/16/2023 12:07:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
2/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The contractor(s) personnel shall be responsible and carry themselves in a professional manner <br />to the general public and City Staff at all times while performing work for the City. The City <br />reserves the right, at the sole discretion of the project manager, and may request the <br />contractor(s) to remove any employee and or sub-contractor(s) for any reason deem <br />detrimental to the City and the safety of the public. <br />5. The City reserves the rights to contract for and perform other or additional work on or near the <br />work covered by these specifications. When separate contracts are let within the limits of any <br />one project, each contractor shall conduct his work so as not to interfere with or hinder the <br />progress or completion of the work being performed by other contractors. Contractors working <br />on the same project shall cooperate with each other as directed. Each contractor involved shall <br />assume all liability, financial or otherwise, in connection with this contract and shall protect <br />and save harmless the City from any and all damages or claims that may arise because of <br />inconvenience, delays, or loss experienced by him because of the presence and operations of <br />other contractors working within the limits of the same project. <br />All information regarding the job order and or documentation related to the project and approved <br />by the City, will then become property of the City. <br />A more detailed scope of work will be provided when/if a specific project or Task Order proposal <br />is requested from the contractor(s). All tasks orders shall include the staff title, hours, hourly rate <br />and totals as related to the project. (See Fee Proposal Section). <br />City Responsibilities: <br />The City will provide information in its possession relevant to the preparation of the <br />required information in the RFP. The City will provide only the staff assistance and the <br />documentation specifically in referred to herein. <br />• Furnish scope of work and provide general direction as needed for the assigned project <br />• All plan check coordination within the City <br />• Advertise, award, and administer of contract <br />• Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards) if <br />needed <br />Fee Proposal: <br />In addition to Section IV.B.3 (Submittal Requirements: Fee Proposal) fee schedule shall be structured <br />as follows: <br />The fee proposal shall include the company's standard hourly fee schedule, and/or project <br />fee schedule where applicable and as outlined in this this documents. A list of all positions <br />and hourly rates required to perform the services described herein. Equipment and material <br />costs/fees to perform Traffic Control should be listed in fee schedule. A more specific scope <br />of work will be provided when/if a project or Task Order proposal is requested from the <br />contractor(s). <br />City of Santa Ana RFP 21-120 <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.