My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Bus Stops/Shelters and Kiosks
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Item 24 - Bus Stops/Shelters and Kiosks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 4:12:15 PM
Creation date
8/16/2023 3:01:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
24
Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Free standing kiosks <br />• Outdoor advertising displays, both static and digital <br />Furthermore, the same original contractual terms entered between the City and the Company would <br />apply to the additional new bus shelters. The City expects the Company to determine the anticipated <br />financial impact and additional income revenue from new or replaced bus shelters. <br />The Company shall arrange, at its own cost and expense, for production, service, and installation of <br />the public service announcements upon consultation with the City. The City shall be entitled to specify <br />certain public service messages to be displayed and shall approve all public service messages. <br />II. PROPOSAL TERMS AND CONDITIONS <br />By submitting a Proposal, the Proposer acknowledges that it has thoroughly examined and accepts the <br />Terms and Conditions of this RFP as described below: <br />A. EXAMINATION <br />Proposer represents that it has thoroughly examined and become familiar with the services and <br />responsibilities required in this RFP and that it is capable of effectively and efficiently performing <br />quality work to achieve the City's objectives. Any attachments referenced herein, or any <br />interpretations, clarifications or amendments subsequently posted in relation to this RFP are fully <br />incorporated. <br />B. EXECUTION OF AGREEMENT <br />The City and the Company will enter into an Agreement similar to that included in <br />ATTACHMENT 5: in the Appendix of this RFP. If a Company is unwilling or unable to execute <br />an Agreement within thirty (30) days after being notified of selection under this RFP, the City <br />reserves the right to select the next most qualified Company or call for new Proposals, whichever <br />the City deems most appropriate. <br />C. PROPOSAL VALIDITY <br />Services, pricing and warranties indicated in a respondent's Proposal must be valid for a period of <br />120 days after the submission of the Proposal. <br />D. PRE -CONTRACTUAL EXPENSES <br />The City of Santa Ana shall not, in any event, be liable for any pre -contractual expenses incurred <br />by Proposers in the proposal preparation. <br />E. JOINT OFFERS/SUBCONTRACTRORS <br />Where two or more Proposers desire to submit a single Proposal in response to this RFP, they <br />should do so on a prime sub -consultant basis. The City intends to contract with only one single <br />Company and not with multiple companies doing business as a joint venture. All sub -contractors <br />are subject to approval by the City. Should the use of sub -contractors be offered, the Proposer shall <br />provide the same assurances of competence for the sub-contractor(s) plus the demonstrated ability <br />to manage and supervise the subcontracted work. Sub -contractors shall not be allowed to further <br />Page 8 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.