My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Contract for Sewage Grinder Units
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
Item 20 - Contract for Sewage Grinder Units
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:26:21 AM
Creation date
8/16/2023 3:47:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
12/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Requirements to notify Powers Bros. of nonconforming product, obtain Powers Bros. <br />approval for nonconforming product, notify Powers Bros.of changes in product and/or <br />process, changes of suppliers, changes of manufacturing facility location and, where required, <br />obtain Powers Bros. approval and, flow down to the supply chain the applicable requirements, <br />including customer requirements. <br />Requirements for test specimens (production method, number, storage conditions) for design <br />approval, inspection, investigation, or auditing <br />Record retention requirements. <br />Right of access by Powers Bros., its customer, and regulatory authorities to all facilities <br />involved in the order and to all applicable records <br />Reminder to the Vendor of their contribution to product or service conformity, safety, and of <br />the importance of ethical behavior. <br />8.5. Production and Service Provision <br />8.5.1.Control of Production and Service Provision <br />General manufacturing and service operations are controlled and tracked in Powers Bros. <br />information system, QuickBooks Premier Contractor edition. <br />Managers/Foremen/Supervisors involved in processes that directly affect quality of <br />intermediate and end products are responsible for ensuring that these processes are identified, <br />planned, and executed under controlled conditions. <br />Controlled Conditions are defined to include the following requirements: <br />• Availability of information describing product characteristics according Correspondent "Job <br />Traveler" and drawing. <br />• Availability of the necessary procedures and forms according to "Top Level Process: <br />Production and Services Process (QMS-PS-002) <br />• Use and maintenance of suitable equipment for production and service operations (See <br />Sections 7.1.5). <br />Availability and use of monitoring and measuring devices. (See Sections 7.1.5) <br />• Implementation of monitoring and measurement activities. (See 9. l.2) <br />• The implementation of product release, delivery and post -delivery activities according to <br />"Shipping Procedure (QMSP-110) <br />8.5.2.Identification and Traceability <br />
The URL can be used to link to this page
Your browser does not support the video tag.